Top Products
The project at the University of British Columbia (UBC) involved replacement of all the high-voltage electrical distribution equipment that powers the majority of the campus. The use of ETAP design software enabled the easy integration of real-time substation monitoring, as it already incorporates the digital twin concept.
Location: Vancouver, British Columbia, Canada
Year: 2021
Efficient planning for system upgrades and transition to operations
This project, which emerged from a feasibility study conducted earlier, will replace all the high-voltage electrical distribution equipment that powers the majority of the University of British Columbia (UBC) campus.
Why did they choose ETAP?
UBC's use of ETAP design software enabled the easy integration of real-time substation monitoring, as the software already incorporates the digital twin concept, facilitating a seamless transition from design to operation. As a result of the business relationship of Schneider Electric and ETAP, UBC chose to integrate Schneider Electric EcoStruxure Power Operation with ETAP for a complete simulation and analysis solution.
Schneider Electric medium voltage switchgear:
University of Columbia Sign at Campus in Vancouver
UNY Substation at University of Columbia, Vancouver, Canada