How Electro Integra used ETAP to perform electrical studies for the expansion of a southern copper mine in Peru

The expansion of the electrical system of the copper mine was accomplished by using a tool like ETAP. ETAP saved us hundreds of engineering man-hours. We were able to create the TCC curves and verify that our protective device settings were correct.
By Gilberto Luy, Technical Manager, Electro Integra SAC

As part of a tailings-dam expansion project, a large, long-operating copper mine in southern Peru needed to increase its power capacity while maintaining continuous operation and high reliability. Existing demand at the tailings area was about 8 MW and had to be increased to 20 MW, including the installation of a new 30 MVA transformer. Operators were already observing excessive voltage drops, especially when large 4.16 kV, 1,250 hp motors started. A complete review of the electrical system was required. Electro Integra used ETAP to create a detailed digital twin with around 1,000 electrical nodes, covering the whole path from 138 kV transmission down to 13.8 kV distribution and finally the 4.16 kV and 480 V loads.


Providing electrical system study for expanded cooper mine

Challenges

  • Expanding power from 8 MW to 20 MW while keeping the tailings dam process running continuously
  • Excessive voltage drop on long feeders, worsened during large-motor starting
  • Low power factor in several parts of the network, sometimes below 70%
  • Need to validate the capacity of existing equipment against current and future short-circuit levels
  • Ensuring motors would start and reach synchronism in what can be a relatively weak system
  • Updating protection settings and verifying proper coordination across the entire network

Which solutions did they choose?

Selected applications

Electro Integra relied on several ETAP modules and tools:

Digital Twin Modeling

  • Full network model (~1,000 nodes) including lines, transformers, motors, voltage regulators and loads
  • Two automatic voltage regulators modeled at key substations

Load Flow Analysis

  • Identification of voltage drops exceeding −5%
  • Evaluation of power factor and recommendations such as transformer tap changes and compensation

Short Circuit Analysis

  • Three-phase, single line-to-ground, line-to-line and line-to-line-ground faults analyzed
  • Studies performed for present grid short-circuit MVA and with a 20–30% higher value to anticipate future national-grid expansion

Motor Starting Analysis

  • Verification that large 1,250 hp pumps would successfully start and reach synchronism; results matched field measurements very closely

Protection & Coordination (ETAP Star)

  • Development of about 500 time-current curves from 138 kV down to 480 V
  • Complete relay setting definition for the entire system
  • Use of Star Auto-Evaluation to check settings against industry standards
  • Use of the Sequence of Operation tool to verify correct operation for specific fault scenarios

Model Validation

  • Digital twin validated against existing SCADA measurements plus additional field measurements

Why do they use ETAP?

Main customer benefits

  • Reliable system expansion from 8 MW to 20 MW with validated equipment ratings and protection
  • Reduced voltage drop and improved power factor based on ETAP-driven recommendations
  • Confidence that large motors will start reliably, supported by analysis that matches field behavior
  • A fully coordinated protection scheme, verified by Star Auto-Evaluation and Sequence of Operation
  • Hundreds of engineering man-hours saved thanks to ETAP’s integrated modeling and study environment
  • A reusable digital twin that the mine can continue to use for future studies and system changes

What do they think about ETAP?

Customer perspective

Using ETAP we built a detailed digital twin of the entire system, validated it against field measurements, and then executed all required studies - load flow, short circuit, motor starting, and coordination. This would have been extremely time-consuming without ETAP.

By Gilberto Luy, Technical Manager, Electro Integra SAC



Videos

Protection Coordination at Panama Mina de Cobre

Design and commission of a green-site power system including protection coordination for the entire site and implementation of IEC61850 communications, inter-tripping, inter-locking and protection blocking schemes.