Top Products
Designing PV systems with integrated storage presents complex challenges for electrical design engineers. Beyond the compliance validations for multiple LV networks, transformers, and substations, PV systems must comply with an additional layer of strict electrical standards. In this webinar, you’ll learn about enhancements to Caneco Electrical to address BESS integration in a sample project using European electrical standards to model multi-network PV system.
Key Learning Objectives:
By attending this webinar, participants will learn how to design, validate, and optimize PV and storage systems efficiently and safely. Caneco Electrical empowers engineers to tackle complex electrical network design for building installations, reduce rework, and deliver future-ready projects - helping them stay ahead in the rapidly evolving energy market.
The webinar includes an interactive Q&A session to address your specific challenges and requirements.
Need a different time? The webinar is offered at three times during the same week. Other times for this webinar:
Start time for this session:
Thursday 10:00 AM GMT / 11:00 AM CET
(2:00 AM - 3:00 AM UTC)
Electrical Design Engineers who design and analyze PV systems, especially those incorporating canopies, rooftop solar, EV charging, and battery storage
Electrical Technicians involved in the installation and maintenance of PV systems with storage systems, to gain an understanding of system functionality and troubleshooting
Renewable Energy Project Developers and Energy Consultants to gain an understanding of the tools and technologies available to ensure project success, cost-effectiveness, and compliance in managing the integration of BESS (Battery Energy Storage Systems)
EPC (Engineering, Procurement, and Construction) companies involved with solar projects focused on cost optimization during the procurement or pricing phase
Utility & Grid Connection Engineers who work would benefit from understanding how developers are modeling protection coordination and voltage stability when multiple PV networks are connected to the substation
Anyone else interested in the intersection of solar energy, EV charging, and battery storage
This webinar is free. Registration is required.
Feb 19, 20262:00 AM - 3:00 AM UTC
ETAP - Corporate Headquarters17 GoodyearIrvine, CA 92618United States+1 (949) 900 1000webinar@etap.com
ETAP Webinars | webinar@etap.com