Power System Analysis
This workshop is conducted and taught in Spanish by the ETAP authorized representative:
PTI S.A.Day | Morning | Afternoon |
---|---|---|
1 |
ETAP Menu and Toolbars Modeling of Power System Components Manual / Auto Building One Line Diagram Display Options Themes and Color Codes Project Revisioning 3-D Database (Presentation, Configuration, Revision) ETAP Library Structure Data Import / Export Data / Project Management Scenario Wizards Exercise |
Basics of Photovoltaic Solar Generation Inverter structure for photovoltaic panels. Investor control. Modeling of panels and solar arrangements in ETAP®. Modelling of inverters in ETAP®. Electrical studies in isolated systems with photovoltaic solar generation. Examples. |
2 | Data Requirements Calculation Methods Load / Generation Modeling in Power System Loading / Generation Categories Diversity / Demand Factors Parameter Settings / Adjustments Reports / Alerts Result Analyzer Exercise |
Short Circuit Study & Evaluation - ANSI ANSI Short Circuit Concept & Overview Data Requirements ANSI Calculation Method 1/2 Cycle, 4 Cycle, 30 Cycle Short Circuit Device Duty Calculation Three Phase Faults Unbalanced / Ground Faults Parameter Settings / Adjustments Reports / Alerts Result Analyzer Exercises |
3 | Protective Device Sequence-of-Operation Protective Device Coordination utilizing Short Circuit Parameter Settings / Adjustment Sequence-of-Operation Study Study / Device Setting Reports Exercise |
|
4 | AC Arc Flash Concept & Overview Calculation Methods (NFPA 70E and IEEE 1584) Data Requirements PPE Requirements, Parameter Settings / Adjustments Effects of Short Circuit & Protection / Coordination Reports / Alerts Result Analyzer Arc Flash Labels Exercises AF Boundary, Incident Energy Plots Analyzing IEEE 1584-2018 & 2002 Differences Current Limiting Breaker (Annex I) & Fuse Equations (Annex H) Conductor Material & 3-P to 1-P Conversion Factors Constant Incident Energy Plots Import & Export – Batch Processing AC Arc Flash Analysis & Result Analyzer AC Arc Flash Concept & Overview Calculation Methods (NFPA 70E and IEEE 1584) Data Requirements PPE Requirements Parameter Settings / Adjustments Effects of Short Circuit & Protection / Coordination Reports / Alerts Result Analyzer Arc Flash Labels Exercises |
DC Arc Flash and High-Voltage Arc Flash (ArcFaultâ„¢) Modeling of DC Sources for DC Arc-Flash AC & DC Arc Flash Concept & Overview Calculation Methods (NFPA 70E and IEEE 1584) Data Requirements PPE Requirements Parameter Settings / Adjustments Effects of Short Circuit and Protection/Coordination Reports / Alerts Result Analyzer Arc Flash Labels Exercise Analysis of Arc Failure in Medium & High Voltage - Terzija & Koglin Method EPRI HVAC AF method: Calculation methodology implemented in ETAP® (Arc Fault): F ground single-phase arc wing in outdoor equipment up to 800 kV; two-phase arc fault in outdoor equipment up to 800 kV; three-phase arc fault to ground in outdoor equipment up to 800 kV; single-phase arc fault to ground, two-phase and three-phase cabinet up to 36 kV; three-phase arc fault using IEEE 1584 extended method up to 36 kV. Arc fault result analyzer. Examples. |
5 |
Descripción del Taller
The purpose of this 40-hour introductory theoretical and practical workshop is to learn how to apply power system engineering knowledge to perform load flow analysis, short circuit analysis, arc flash hazard analysis, protection coordination, grounding grid design, harmonics analysis, and transient stability analysis, as well as to model power systems using ETAP software.
The course covers basic aspects of topics such as power system modeling, circuit breaker sizing, power flow problems, short circuit analysis, and protection coordination.
An ETAP version 22.5 working station is provided to each attendee.
Quién debe Asistir
New users of ETAP software and engineers who wish to enhance their skills in power system analysis using the ETAP application to conduct load flow, short circuit, arc flash, and protection coordination studies.
It is recommended to have knowledge and concepts of power system engineering for those attending this workshop.
Registro
Cuota: $ 1,100
USD $ 1,100
This cost does not include taxes.
Ubicación
Hotel Rosales Plaza- Bogotá. Calle 72 N.º 5 – 47
Fecha y Hora
8:00 AM - 5:00 PM
Comida
Hotel
Información
PTI S.A.
Av. Guadalupe, K-56, No. 2-50
Cali, Santiago de Cali
Colombia
+57 2336 6461
etap@pti-sa.com.co
ETAP Servicios de Entrenamiento | (949) 900-1084 | training@etap.com