ETAP 113 ES

Power System Analysis

3-Day Workshop
Nov 6 - 8, 2019
Madrid, Spain
Fee: 970
This workshop is conducted and taught in Spanish by the ETAP authorized representative: Genin & Garces
DayMorningAfternoon
1

ETAP Company Background
ETAP Global Offices
ETAP & Supporting Various Industries
ETAP & Power System Solutions
Quality Assurance, Technical Support & Trainings

Data Requirements
Calculation Methods
Load / Generation Modeling in Power System
Loading / Generation Categories
Diversity / Demand Factors
Parameter Settings / Adjustments
Reports / Alerts
Result Analyzer
Exercise
2

ANSI Short Circuit Concept & Overview
Data Requirements
ANSI Calculation Method
1/2 Cycle, 4 Cycle, 30 Cycle Short Circuit
Device Duty Calculation
Three Phase Faults
Unbalanced / Ground Faults
Parameter Settings / Adjustments
Reports / Alerts
Result Analyzer
Exercises

Data Requirements
IEC 909 Calculation Method
Types of Short Circuit in IEC & Factors
Device Duty Calculation in Mesh & Non-Mesh Networks
Unbalanced / Ground Faults
IEC 61363 Transient Fault Current Calculation
Parameter Settings / Adjustments
Reports / Alerts
Result Analyzer
Exercises

Calculation Methods (NFPA 70E and IEEE 1584)
Data Requirements
PPE Requirements, Parameter Settings / Adjustments
Effects of Short Circuit & Protection / Coordination
Reports / Alerts
Result Analyzer
Arc Flash Labels
Exercises

Enhanced IEEE 1584 Parameters
Effects of Short Circuit & Protection / Coordination
Report and Arc Flash Labels
PPE Requirements
Mitigation Exercise

AC Arc Flash Concept & Overview
Calculation Methods (NFPA 70E and IEEE 1584)
Data Requirements
PPE Requirements
Parameter Settings / Adjustments
Effects of Short Circuit & Protection / Coordination
Reports / Alerts
Result Analyzer
Arc Flash Labels
Exercises
3

Data Requirements
Conduit, Raceway, Duct Bank & Heat Source Modeling
Calculation Methods / Settings
Temperature / Ampacity Calculation
Transient Temperature Calculation
Cable Sizing
Reports / Alerts / Plots
Exercise

Data Requirements
Protection Equipment Library
Protection & Selectivity Concepts
Protective Device Arrangements
Time-Current Characteristics
Protective Device Coordination utilizing Short Circuit
Parameter Settings / Adjustment
Sequence-of-Operation Study
Auto Coordination Concept & Application
Study / Device Setting Reports
Exercise
4
5
6
7

Workshop Description

  • The purpose of this 3-day introductory hands-on workshop is to learn power system modeling & analysis using ETAP software.
  • This workshop covers a range of ETAP functionalities used to solve various power system practical problems such as equipment sizing in steady state and short circuit conditions, protection & coordination, arc flash assessment & mitigation, and ground grid systems.
  • Supporting materials will be provided in PDF, a computer student, certificate of attendance.
  • The course is taught in Spanish.
  • An ETAP workstation is provided for each attendee.
 

Who should attend

  • New ETAP users and power engineers who wish to increase their skills using the ETAP application to perform system studies
  • Current users seeking a refresher course
  • Knowledge of power system engineering concepts is highly recommended for those attending this workshop

Registration

Fee: € 970


Registro y coste:  1.500 + I.V.A.    El pago es por transferencia a favor de Genin & Garcés S.L.  IBERCAJA IBAN: ES47 2085 9276 37 0330496



Location

Centro Empresarial El Coloso
Calle Leganitos 15-18
28013 Madrid
Tel: 915 59 01 42

Date & Time

Nov 6 - 8, 2019
9:00 AM - 6:00 PM

Meal

Café and cookies.

Hotel

All travel and hotel arrangements are the responsibility of the attendees.

Information

Genin & Garces
Calle Pollensa, 2 Edificio Artemisa, Planta 1, Oficina 9.1 Las Rozas 28290, Madrid, España.
Las Rozas de Madrid, 28230
Spain
+34 918496224
+34 9185 10026
info@garces-es.com

 

ETAP Training Services | (949) 900-1084 | training@etap.com

Customers may be experiencing problems accessing some of resources on the ETAP website due to an outage by one of our service providers. We are actively working to resolve the issue.