306 Item(s) found

Development of a Python Optimization Model for the Analysis and Planning of PMU Locations in Electrical Networks​

Development of a Python Optimization Model for the Analysis and Planning of PMU Locations in Electrical Networks​

The proposed methodology aims to seamlessly integrate an optimization algorithm with etapPY, minimizing the number of PMUs required, strategically placing them within the electrical network, and enhancing overall system observability to empower network operators with advanced analytical tools for comprehensive monitoring and analysis.

Drakenstein Municipality Control Center uitlizing ETAP SCADA & DMS to communicate with and control substations

Drakenstein Municipality Control Center uitlizing ETAP SCADA & DMS to communicate with and control substations

Drakenstein Municipality sought an OEM partner to establish a SCADA Main Station in their Control Centre, supervising the distribution network of the Dalweiding Substation supply area, integrating substation protection and control solutions using the IEC 61850 standard, with ETAP chosen for its digital-twin concept, model-driven approach, and modular scalability, facilitated by Altek Solutions.

Optimizing operations with electrical Load Management System at FFC chemical Plant

Optimizing operations with electrical Load Management System at FFC chemical Plant

Thisproject highlights ETAP's collaboration with Fauji Fertilizer Company Limited (FFC) of Pakistan to replace their existing Electrical Load Management System (ELMS) with ETAP’s iLS™ (Intelligent Load Shedding System), integrating IEDs for real-time monitoring and load calculation, utilizing ETAP’s digital-twin platform and model-driven solution to effectively meet load shedding requirements and enhance system reliability.

How to Simulating High Voltage Short Circuit in Scale Cascade Transmissions Lines

How to Simulating High Voltage Short Circuit in Scale Cascade Transmissions Lines

This study utilizes ETAP software to analyze a real high voltage short circuit in scale cascade transmission lines, employing the Real Time (RT) and SCADA Integrator module for simulation, including load-flow and transient analysis, with experimental validation conducted in the Renewable Energy and Smart Grid Laboratory at UTEC, highlighting the novelty of simulating a high voltage short circuit with experimental validation.

Optimizing Modeling Efficiency With GIS Data

Optimizing Modeling Efficiency With GIS Data

ETAP and EnergyTron collaborate to integrate GIS data into power system software, streamlining the design process for brownfield projects by providing valuable information on existing electrical assets and terrain features, although the success relies on the accuracy and completeness of the GIS data.

Natural gas well power network management using ETAP NetPM

Natural gas well power network management using ETAP NetPM

Explore our innovative solution utilizing ETAP to manage the challenges of power distribution networks in Queensland's Western Downs region, where dynamic infrastructure and evolving gas well lifecycles necessitate robust data collection, network monitoring, and reliable studies, bolstered by stringent cybersecurity measures and a collaborative master model shared among subcontracted consultancies to ensure reliability and efficiency.

Evaluation of generator protective relay current transformer (CT) saturation using ETAP

Evaluation of generator protective relay current transformer (CT) saturation using ETAP

Explore the complexities of current transformer (CT) saturation's impact on protective relay performance in high fault current scenarios, examining the importance of accurate CT selection and contrasting ETAP's saturation analysis capabilities with traditional methods in a real-world scenario, providing insights to enhance protective relay operation and system reliability.

How ETAP Arc Flash Calculator helped me detect significantly flawed arc-flash studies

How ETAP Arc Flash Calculator helped me detect significantly flawed arc-flash studies

I categorize findings from arc flash study reports, noting errors in spelling, grammar, data input, and layout, but the most critical, like inconsistent results, demand attention; I rely on the ETAP arc flash calculator to detect significant inaccuracies, exemplified by a case with a GE Prolec transformer, emphasizing the need for meticulous data review to prevent mislabeling incidents.

Managing European Arc-Flash Safety Requirements using ETAP

Managing European Arc-Flash Safety Requirements using ETAP

Explore how ETAP can assist in meeting European directives for arc flash studies and understand the distinctions between North American and European electrical safety standards, offering crucial insights for professionals.

How to Advance Results Accuracy: Transitioning Arc Flash Studies to IEEE 1584-2018

How to Advance Results Accuracy: Transitioning Arc Flash Studies to IEEE 1584-2018

Explore how outdated Arc Flash Study findings were overcome by utilizing ETAP software to update equipment data, validating short circuit currents, and generating fresh Arc Flash results aligned with the 2018 standard, providing the client with enhanced safety measures and confidence in their protocols.