Motor Acceleration analysis for floating platform
- 20:07
- Case Study
Study case with two distant floating units interconnected with a subsea cable and fed by gas turbine generators. ETAP software has been used for motor starting analysis. A discussion about the choice of motor and generator models is developed and the comparison between calculation methods is presented. A particular focus is made on motor starting methods when direct on line is not possible, including soft starter simulation and VSD representation.
Modeling Large Grounding Grids
- 13:36
- Case Study
This presentation discusses the modeling of two large fossil fuel generating stations in Texas. One station was constructed with UFER grounds, zinc ground rods, and insulated conductors for connecting the zinc ground rods. Different techniques employed for successful solutions within the existing capabilities of the ETAP grounding module and interpretation of results will be presented.
Modeling a complex electrical network: Rumaila oil field ETAP electrical model
- 19:23
- Case Study
This presentation will describe some of the Rumaila Oil Field gathering methods, calculations, limitations, relay protection reviews, and future plans of the ROF electrical distribution system. The ROF ETAP electrical model will support a safe, reliable, documented, and analyzed electrical distribution system and expanded to arc-flash calculations and the ETAP Real-Time.
Model-based integrated solutions for oil & gas production fields
- 15:01
- Case Study
This presentation will showcase KOC Electrical Information Manager System (EIMS). The main objective of EIMS is to automate the process of reserving power supplies and updating by interfacing between GIS and ETAP programs in all KOC Assets.
Microgrids at Work: Real-World Business Case Examples
- 16:20
- Case Study
An in depth discussion Microgrids can deliver enhanced reliability, energy and cost-efficiency, as well as environmental benefits. This discussion will walk you through the key drivers for "why a microgrid", "what types of microgrids there are" and "how a microgrid is developed"
Microgrid Solutions and Business Case Examples
- 36:35
- Case Study
This presentation will discuss how Microgrids can deliver enhanced reliability, energy and cost-efficiency, as well as environmental benefits. This presentation will highlight how ETAP software was used to design and model a microgrid consisting of new and existing infrastructure.
Low Voltage Arc Flash hazard assessment using ETAP
- 19:35
- Case Study
DeltaSE has been tasked with updating some facilities to the latest standard by providing Arc Flash analysis, field assessment and training to our Clients utilizing ETAP. This presentation will highlight how ETAP was used as a tool to help our clients and discuss some of the challenges ahead with low voltage arc flash hazard assessments.
Integrated System Modeling for Traction Power Systems
- 18:30
- Case Study
Network Rail owns and operates the main line railway infrastructure of Great Britain. Approximately half of the network is electrified, including a substantial DC electrified network in the South East, fed by a 33 kV HV three-phase network. Network Rail has transferred its standard system models for this HV network to ETAP. This presentation gives an overview of the use of ETAP for this system, and the challenges for the future.
Holcim Cement
- 7:51
- Case Study
How Holcim Cement improved system reliability and reduced unplanned power outages
ETAP Partnership with ITER for Nuclear Fusion Power
- 23:07
- Case Study
ITER is a large-scale scientific experiment to demonstrate if it is possible to produce commercial energy from nuclear fusion. From conceptual design to construction design ITER uses ETAP at each project stage. The presentation will describe how ETAP is currently used, for manufacturing parameters validation, as well as transient analysis for plant systems scenarios validation. Next project steps, including testing and commissioning using ETAP as support tool will be discussed as well as pilot case of ETAP Real Time implementation.