The National Electrical Code (NEC) standard uses the NFPA 70 method and applies to above ground cables.
Tray Configuration Options
This method does not consider fill conditions exceeding the nominal depths of a maximum fill condition.
Top Covered tray
Cables kept with Maintained Spacing
Cable Raceway Installations
A/G Conduit
A/G Trays
Air Drop
Alert for Allowable Ampacity
ETAP provides alerts to the user when a critical situation occurs. A critical situation may deteriorate
the cable and tremendously reduce its lifetime. The alerts tool of the cable ampacity study software is based on the options listed below.
Based on the calculated Derated Ampacity
User-Defined value
Based on thermal analysis results of underground raceway systems module
Temperature Correction
Calculate the derated ampacity based on the ambient and conductor temperatures. In addition, the user can either select the base temperature provided by the manufacturer or the operating temperature of the cable.
Cable Fire Protection
Select from fire protection layers available in the ETAP Library:
Cable Thermal Insulation
Cable Insulation Length of able thermal insulation
This cable ampacity analysis program calculates derating factors for cable trays according to NEC. The cable ampacity analysis software applies to cables in above ground trays, conduits, and air drop.
The NEC Standard does not provide cable ampacity derating due to bottom cover or correction of the cable ampacity multiplying factors due to the cumulative effects of combinations of tray covers and fireproofing. In general, cable sizes of 2/0 AWG and smaller are installed in cable trays in a randomly filled manner, with a maximum of two cables high.
Base cable ampacity of randomly filled trays are based on installations at a uniform depth up to the maximum of 30% fill for 3 or 4-inch tray depths. The cable ampacity assessment tool applied here corresponds to a maximum fill condition and does not consider fill conditions exceeding the nominal depths.
For NEC standard, the selected cable Base ampacity must be in accordance with the cable ampacities listed in the tables from NEC Article 310.
Videos
Literature
White Papers
Training & Events
Training & Events
Get an in-depth insight to our electrical engineering software by requesting a training course that suits you.
Take a test drive of ETAP free for 30 days to experience for yourself the capabilities of ETAP solutions. Try out ETAP’s extensive collection of modules and analysis results on this cloud-based demo platform - anytime and anywhere. Start your online demo today!