Nuclear Utility User Group

5th Annual NUUG - June 22-24, 2005

The 2005 annual conference was attended by 22 users from 12 companies. The conference was information packed with a variety of presenters. Topics included: ETAP 5.0 & 5.5 Enhancements, Balancing the Load Flow Model with Plant Trend Data LTC Application Considerations, Device Coordination (Star), Arc Flash - Enhancement and Star, TransientStability Modeling, Dynamic Parameter Tuning and Dependencies, Emergency Diesel Generator, Motor Acceleration with Motor Starting and Transient Stability Modules, Main Transformer Replacement Analysis with ETAP, Battery Sizing with Control System Diagram, DCSDM Database Conversion to ETAP, ETAP 6.0 Enhancements, Quality Assurance, and Roundtable Discussion.

The Agenda was as follows:
  • ETAP Enhancements
  • Load Flow Analysis
  • Device Coordination - Star
  • Arc Flash
  • Transient Stability
  • Emergency Diesel Generator
  • Motor Acceleration
  • Control System Diagram
  • Quality Assurance
  • ETAP Future Enhancements
ETAP NUUG 2005 Agenda.

Event Gallery