594 Item(s) found

How to dynamically model & analyze generator stability during step loading using ETAP software

How to dynamically model & analyze generator stability during step loading using ETAP software

This study simulates the impact of step loading on the transient stability of a 2 x 25 MW GTG-based captive power plant at one of the Chemical Fertilizer Plants located at Trombay, India. The variation of electrical frequency and terminal voltage of the generator during the most conservative step loading of one generator unit is studied. The loads divided in steps are switched at certain time intervals to determine whether the frequency profile of the system is within the acceptable limit of ±5%. Load Flow and Short Circuit Studies are performed on the entire power plant distribution network of the fertilizer plant in advance to check the adequacy of equipment ratings during normal and short circuit conditions with all verified input data. The step load response study is carried out with only one GTG unit running in isolation, feeding only the critical emergency loads. Transient behavior of the GTG unit is simulated with IEEE transfer function dynamic models, viz. AC8B model of excitation system (AVR) and IEEE GGOV1 model for turbine governing system using the in-built standard library in ETAP software version 16.1.0. Various parameters of the generator like speed, active and reactive power, bus voltage, and frequency are plotted for determining the transient performance of the GTG unit.

Sustainable Transportation - SCADA & Maintenance Planning – MMRC Project Update

Sustainable Transportation - SCADA & Maintenance Planning – MMRC Project Update

Today’s Transportation businesses call for sustainable mobility. The goal is to deliver an end-to-end digital solution throughout the asset lifecycle to optimize critical mobility infrastructure management for the optimal customer experience in rail, airports, roads, and ports. This case study for Mumbai Metro Rail covers Operator Training Simulator (OTS), a simulation environment to test operations in a real-time environment for the following reasons: error avoidance, communication enhancement & training of new crews, train inexperienced operators, certification and competency for operators, situational awareness & workload management. Learn about the scope of work, implementation requirements, lessons learned, and future developments of this project.

How ETAP was utilized  to  expand  the Electrical System at the Tailings Dam Copper Mine in Peru

How ETAP was utilized to expand the Electrical System at the Tailings Dam Copper Mine in Peru

As part of their Tailings Dam Expansion project, a large copper mine in Peru required to have several studies performed in their electrical system. As loads were added and the topology of the system was changing, the client wanted to ensure that their electrical system would be able to handle the new loads and operate reliably and efficiently. Electro Integra S.A.C. was hired to perform Load Flow, Short Circuit, Relay Coordination, Motor Starting and Optimal Capacitor Placement studies. ETAP was used as the tool to perform all the studies because the client has been using ETAP for over 20 years. Since 2000, Electro Integra has partnered with ETAP to bring their software solutions to the Peruvian market. Continuous development and investment in ETAP Solutions has kept them as the de facto standard for power system analysis for all types and sizes of electrical industries.

Industrial Plant Electrical Risk Management Program

Industrial Plant Electrical Risk Management Program

The Electrical Risk Management (ERM) group at FTI uses ETAP to provide short circuit, coordination, and arc flash studies as a part of building a safety program for industrial facilities around the US and Canada. This presentation will describe our approach to an overall safety program and the ways that a safety program encompasses more that just an engineering study. Some topics to be discussed are the need for maintenance personnel to understand the labeling, assessing the risk vs. just looking at the label, the choice between full coordination and arc flash hazard, field verification, and bolted fault current vs arcing fault current as it relates to equipment evaluation. We will look at the ETAP model of one of our industrial customers and discuss the benefits of using ETAP for our studies – reliability, adaptability to many systems by using configurations and scenarios, wizards, availability of DC and MV calculations, Star TCCs, ease of exporting reports to Excel, and solar and wind sources capability.

ETAP ArcSafety Solution Overview - A comprehensive suite of Arc Flash software analysis tools

ETAP ArcSafety Solution Overview - A comprehensive suite of Arc Flash software analysis tools

Learn about ETAP ArcSafety, an all-in-one AC & DC arc flash solution for LV, MV & HV systems that improves safety, reduces risk, minimizes equipment damage, and validates mitigation techniques.

Lightning Risk Assessment

Lightning Risk Assessment

In this video, we demonstrate how to use ETAP’s Lightning Risk Assessment (LRA) module to assess the risk of a lightning strike and the probability of damage. Learn about the LRA calculation methods used in ETAP and how to perform the LRA to comply with internationals standards NFPA 780-2020, 2014 and IEC 62305-2: 2010. Explore the important reasons behind Lightning Risk Assessment. From lightning as the number one cause of power surges, to preventing damage, fires and other harm to lives and property, accounting for unpredictable weather patterns and asset protection, as in buildings, power infrastructure, and human lives, ETAP's Lightning Risk Assessment module will calculate the risk and suggest steps to prevent harm to humans and infrastructure.

How to analyze the incident energy for PV systems with ETAP DC Flash Analysis software

How to analyze the incident energy for PV systems with ETAP DC Flash Analysis software

Learn how ETAP DC Arc Flash Analysis software calculates the incident energy for photovoltaic systems, while considering different methods such as Maximum Power, Stokes and Oppenlander, Paukert, DGUV-I-203-077. This presentation shows how ETAP applies the DC arc incident energy models developed in IEEE "Methods for Evaluating DC Arc Incident Energy in Photovoltaic Systems"

Applying ETAP to Calculate, Analyze and Install BESS in the Vietnam Power System

Applying ETAP to Calculate, Analyze and Install BESS in the Vietnam Power System

This case study presented by Vu Duc Quang, Deputy Director of Training, Research and Development Center, at PECC2 in Vietnam, explains how peaking electricity consumption in North - and high penetration of renewable energy sources in South Vietnam pose great pressure on the grid. PECC2 utilized ETAP to model Vietnam's power system, calculate and analyze power systems scenarios, identify the optimal location and install capacity of Battery Energy Storage Systems, based on the criteria of reducing/avoiding overload of the power grid and peak shaving. This presentation will demonstrate how BESS solutions with capacity and location calculated with ETAP have shown a clear effect in reducing the power system’s overload.

How to perform Harmonic Analysis with ETAP

How to perform Harmonic Analysis with ETAP

Learn how engineers use ETAP Harmonic Analysis software to simulate harmonic current and voltage sources, identify harmonic problems, reduce nuisance trips, design, and test filters, and report harmonic voltage and current distortion limit violations on balanced or unbalanced systems. Additionally, for transmission and distribution system operators, Harmonic Grid Code automates harmonic analysis for detailed power quality assessment reporting demonstrating the generation facility is designed to comply with applicable harmonic limits. Study reports include worst-case incremental and total harmonic distortion, frequency-dependent Thevenin Equivalent at PCC, and color-coded impedance loci charts.