ETAP 113 CN

Power System Analysis

3-Day Workshop
May 16 - 18, 2018
Nanjing, China
Fee: 2,000
Nanjing Office
DayMorningAfternoon
1

ETAP Company Background
ETAP Global Offices
ETAP & Supporting Various Industries
ETAP & Power System Solutions
Quality Assurance, Technical Support & Trainings

etapAPP™ - Data Collection & Synchronization App
StarZ™ - T&D Protection & Coordination
ArcFault™ - High Voltage Arc Flash
TDLF - Time Domain Load Flow 
DataX™ - Revit Interface, EMT Interface
eTraX™ - Rail Traction System
Major Enhancements

ETAP Menu and Toolbars
Modeling of Power System Components
Manual / Auto Building One Line Diagram
Display Options
Themes and Color Codes
Project Revisioning
3-D Database (Presentation, Configuration, Revision)
ETAP Library Structure
Data Import / Export
Data / Project Management
Scenario Wizards
Exercise

Data Requirements
Calculation Methods
Load / Generation Modeling in Power System
Loading / Generation Categories
Diversity / Demand Factors
Parameter Settings / Adjustments
Reports / Alerts
Result Analyzer
Exercise

Data Requirements
IEC 909 Calculation Method
Types of Short Circuit in IEC & Factors
Device Duty Calculation in Mesh & Non-Mesh Networks
Unbalanced / Ground Faults
IEC 61363 Transient Fault Current Calculation
Parameter Settings / Adjustments
Reports / Alerts
Result Analyzer
Exercises
2

Motor and motor starting theory
Static motor starting analysis
Study case editor
Motor parameter estimation
Dynamic motor starting analysis
Plots, display results and reports

Overview of Induction Motor Nameplate
Induction Motor Model & Library
Induction Motor Load Model & Library
Estimating Motor Parameters Based in Nameplate
Parameter Estimation Tuning
Reports and Plots
Exercise

Data Requirements
Protection Equipment Library
Protection & Selectivity Concepts
Protective Device Arrangements
Time-Current Characteristics
Protective Device Coordination utilizing Short Circuit
Parameter Settings / Adjustment
Sequence-of-Operation Study
Auto Coordination Concept & Application
Study / Device Setting Reports
Exercise

Review and Practical Example

  • Overview and Minimum Requirements
  • Protection and Coordination Rule Book
  • Tabular and Graphical Analysis Viewer
  • Tabular and Graphical Reports
  • Procedure and Study Steps
  • Minimum Time Requirements for Coordination
  • Evaluation of Zone Selective Interlock Scheme
3

Data Requirements
Harmonic Source Modeling
Harmonic Library / Inter-Harmonics
Harmonic Load Flow / Frequency Scan
Parameter Settings / Adjustment
Reports / Alerts / Plots
Exercise
4
5
6
7

Workshop Description

  • This hands-on workshop provides the skills, knowledge, and techniques necessary to become proficient in ETAP to conduct power system studies. The purpose of this workshop is to develop a thorough understanding of ETAP’s capabilities and analytical techniques to solve a variety of practical problems. 
  • An ETAP computer workstation is provided for each attendee.

Who should attend

  • This workshop is tailored for both beginner and intermediate electrical engineers.

Registration

Fee: ¥ 2,000


Please contact Wenjing Yong or Chrissie Cai at +86 (25) 8361 0133.
Seating is limited, please register before May 11.

Location

Nanjing University of Aeronautics and Astronautics
No. 29, Yudao Street
Nanjing, Jiangsu, China
 

Date & Time

May 16 - 18, 2018
8:30 AM - 5:00 PM

Meal

Beverages and lunch included with the registration fee.

Hotel

All travel and hotel arrangements are the responsibility of the attendees.

Information

Nanjing Office
5 Guangzhou Road Junlin International B-1402
Nanjing, Jiangsu 210008
China
+86 (25) 8361 0133
+86 (25) 8361 0132
101china@etapchina.com

ETAP Training Services | (949) 900-1084 | training@etap.com