How ETAP Microgrid Controllers manage the Red Sea Utility off-grid Microgrids in Tabuk Resort
- 19:59
- Case Study
Discover the Red Sea Utility Grid's cutting-edge design in Saudi Arabia, featuring four off-grid microgrids ensuring high reliability through redundancy and advanced technology, each showcasing a meticulous balance between solar energy and backup generators, with the ETAP microgrid controller (eMGC) optimizing operations and facilitating collaborative control for stability, including innovative strategies like soft energization for black starts and transformer inrush current avoidance.
Navigating Grid Stability in Renewable Energy-Rich Environments: ETAP's Operator Training Simulator
- 12:23
- Case Study
In transmission systems grappling with the unpredictability of renewable energy sources, ETAP's Operator Training Simulator (OTS) provides a cutting-edge solution, leveraging digital twin technology and real-time data to anticipate system performance uncertainties, as demonstrated through its integration into Web Aruba's operations, enhancing grid resilience and efficiency amidst renewable energy variability.
Development of a Python Optimization Model for the Analysis and Planning of PMU Locations in Electrical Networks
- 17:45
- Case Study
The proposed methodology aims to seamlessly integrate an optimization algorithm with etapPY, minimizing the number of PMUs required, strategically placing them within the electrical network, and enhancing overall system observability to empower network operators with advanced analytical tools for comprehensive monitoring and analysis.
Drakenstein Municipality Control Center uitlizing ETAP SCADA & DMS to communicate with and control substations
- 21:15
- Case Study
Drakenstein Municipality sought an OEM partner to establish a SCADA Main Station in their Control Centre, supervising the distribution network of the Dalweiding Substation supply area, integrating substation protection and control solutions using the IEC 61850 standard, with ETAP chosen for its digital-twin concept, model-driven approach, and modular scalability, facilitated by Altek Solutions.
Optimizing operations with electrical Load Management System at FFC chemical Plant
- 22:39
- Case Study
Thisproject highlights ETAP's collaboration with Fauji Fertilizer Company Limited (FFC) of Pakistan to replace their existing Electrical Load Management System (ELMS) with ETAP’s iLS™ (Intelligent Load Shedding System), integrating IEDs for real-time monitoring and load calculation, utilizing ETAP’s digital-twin platform and model-driven solution to effectively meet load shedding requirements and enhance system reliability.
How to Simulating High Voltage Short Circuit in Scale Cascade Transmissions Lines
- 6:46
- Case Study
This study utilizes ETAP software to analyze a real high voltage short circuit in scale cascade transmission lines, employing the Real Time (RT) and SCADA Integrator module for simulation, including load-flow and transient analysis, with experimental validation conducted in the Renewable Energy and Smart Grid Laboratory at UTEC, highlighting the novelty of simulating a high voltage short circuit with experimental validation.
Optimizing Modeling Efficiency With GIS Data
- 18:25
- Case Study
ETAP and EnergyTron collaborate to integrate GIS data into power system software, streamlining the design process for brownfield projects by providing valuable information on existing electrical assets and terrain features, although the success relies on the accuracy and completeness of the GIS data.
Natural gas well power network management using ETAP NetPM
- 11:56
- Case Study
Explore our innovative solution utilizing ETAP to manage the challenges of power distribution networks in Queensland's Western Downs region, where dynamic infrastructure and evolving gas well lifecycles necessitate robust data collection, network monitoring, and reliable studies, bolstered by stringent cybersecurity measures and a collaborative master model shared among subcontracted consultancies to ensure reliability and efficiency.
Evaluation of generator protective relay current transformer (CT) saturation using ETAP
- 24:33
- Case Study
Explore the complexities of current transformer (CT) saturation's impact on protective relay performance in high fault current scenarios, examining the importance of accurate CT selection and contrasting ETAP's saturation analysis capabilities with traditional methods in a real-world scenario, providing insights to enhance protective relay operation and system reliability.
How ETAP Arc Flash Calculator helped me detect significantly flawed arc-flash studies
- 20:02
- Case Study
I categorize findings from arc flash study reports, noting errors in spelling, grammar, data input, and layout, but the most critical, like inconsistent results, demand attention; I rely on the ETAP arc flash calculator to detect significant inaccuracies, exemplified by a case with a GE Prolec transformer, emphasizing the need for meticulous data review to prevent mislabeling incidents.