Top Products
In 2019, SEPCOIII was chosen as the EPC contractor for the large-scale Tidia Entertainment City project in Saudi Arabia. The project spans approximately 28,000 square kilometers, encompassing lands, islands, beaches, deserts, mountains, and volcanic areas. This luxury tourism development project in Tabuk Province, Saudi Arabia, aims to create a high-end destination offering unparalleled marine and environmental attractions for Red Sea tourism. Learn how SEPCOIII relied on ETAP's Advanced Distribution Management System (ADMS) to assist with the technology challenges for the project’s distributed energy power system and how the solution is used to manage and supervise the power distribution system to achieve better optimizations and improve system stability.
Shandong Electric Power Construction Corporation III, or SEPCO III, is a Chinese construction and engineering company that designs, builds, operates, and owns power plants. SEPCO3 offers the construction of power plants via the EPC method (Engineering, Procurement, Construction) on a turnkey lump sum basis. Moreover, SEPCO3 also provides the development of power plant projects through BOT (Build-Operate-Transfer) and BOO(T) Build-Operate-Own(-Transfer) methods.
Location: Riyadh, Saudi Arabia
Year: 2024
Real-time electric power monitoring
Which solutions did they choose?
Selected applications for planning, design, modeling, and operating with geospatial visualization:
ETAP, a comprehensive, turnkey real-time solution for centralized and remote network operations and management based on the electrical network's digital twin model, to create a Transmission Distribution Management System (TDMS). ETAP software manages all process stages, from design to build and operation. The microgrid management solution for city-scale operation includes:
ETAP Digital Twin Modeling
ETAP SCADA
ETAP Power Management System
ETAP Operator Training Simulator
ETAP Protection & Asset Management
ETAP Arc Flash
ETAP Protection and Coordination
ETAP Power Flow
ETAP Distribution Network Analysis
ETAP Intelligent load Shedding
ETAP Microgrid
ETAP Mobile APP
ETAP NetPM
Why do they use ETAP?
What do they think about ETAP?
Haishan Wang, Engineering Director & Engineering Manager of Red Sea project
This Red Sea Project is a groundbreaking endeavor in Saudi Arabia under the Saudi Vision 2030 economic development program. The project is powered by a fully renewable energy system, including large-scale solar photovoltaic (PV) system and a substantial 1.3 GWh energy storage system, effectively providing 100% clean energy to the development. As the Engineering, Procurement and Construction firm for this project, SEPCOIII has been involved with the design and construction of a wide range of permanent utility assets, including support facilities such as desalination plants, power generation facilities and distribution networks for water, electricity and natural gas. In this presentation, learn how SEPCOIII relied on ETAP's Advanced Distribution Management System (ADMS) to assist with the technology challenges for the project’s distributed energy power system, and how the solution is being used to manage and supervise the power distribution system to achieve better optimizations and improve system stability.