In January 2022, Drakenstein Municipality released a tender for a SCADA system solely for monitoring purposes. Schneider Electric, ETAP, and Altec decided to examine this project and offer the customer something that far exceeds a conventional SCADA system, taking into account the customer's vision and requirements. This case study focuses on the digital journey proposed for this customer in Phase 1 of the project.
Drakenstein Municipality is a local municipality within the Cape Winelands District Municipality in the Western Cape province of South Africa. The Drakenstein Electro—Technical Services Division is responsible for supplying electricity to the Paarl, Wellington, Simondium, and Klapmuts areas. An estimated 51,000 electricity consumers reside in the Drakenstein area. The Drakenstein Municipal Notified Demand with ESKOM amounts to 175 MVA per month.Altek Company is a premier system integrator and a leading multidisciplinary engineering firm. It specializes in delivering comprehensive engineering intelligence and data management solutions from start to finish.
Location: Drakenstein Municipality, Western Cape, South Africa
Year: 2023
Starting the digitalization process effectively
Which solutions did they choose?
They selected the ETAP game of products, which includes a Real-Time Advanced Distribution Management System with eSCADA, GIS, mobile etapAPP, and an Outage Management System.
The primary solution is the eSCADA software, which facilitates network monitoring and operation, as well as grid visualization, on computers, tablets, and mobile devices.
Why do they use Etap?
What do they think about ETAP?
The digital transformation, as mentioned, creates a digital replica of the entire electrical network, where we utilize the etapAPP to capture site information. When we undertook model development with diagnostics, ETAP was and is a robust beast.Alvin Naidoo, Managing Director, Altek Solutions
The technology in place when creating a system that accommodated both legacy and newer technologies was relatively easy due to the robustness of ETAP and the communication protocol. The design we implemented in the system, being future-ready with phases two and three in mind, helped us create the most future-ready system available on the market.By Mr. Alvin Naidoo, Managing Director, Altek Solutions
Drakenstein Municipality sought an OEM partner to establish a SCADA Main Station in their Control Centre, supervising the distribution network of the Dalweiding Substation supply area, integrating substation protection and control solutions using the IEC 61850 standard, with ETAP chosen for its digital-twin concept, model-driven approach, and modular scalability, facilitated by Altek Solutions.
eSCADA
System Modeling and Visualization
Advanced Distribution Management System
Intelligent Load Shedding
Electrical SCADA
Grid Modeling & Visualization
etapAPP™