Data Centers & Network Operations Center

ETAP Data Center Banner

ETAP Intelligent Data Center & Mission Critical Facility Solution

Intelligent Mission-critical Facility Management Begins with Digital Transformation

ETAP Top 10 Data Center Solution ProviderDatacenter design and operations must allow for safety, reliability, efficiency, compliance, and sustainability throughout the life-cycle from design, commissioning to operations. Strengthen your organization with ETAP digital transformation solutions which increase design efficiency and provide deep operational insight for decision-makers, converting your data center power infrastructure from traditional to cutting-edge.




ETAP Solutions Serve the Entire Data Center Industry

Data Center MIssion Critical

ETAP is utilized in mission critical facilities as an integrated electrical power system design and digital twin driven electrical control & power management system (EPMS) from design to operations.

  • Cloud Data Centers
  • Network Operations
  • Enterprise Managed Services
  • Telecom Centers
  • Co-Locations



Accelerating Energy Transformation from Design to Operate on a Unified Electrical Digital Twin

Multi-Platform & Non-Unified Lifecycle leads to negative impact in terms of errors & omissions, rework, lost time, and increased costs from design to commissioning and operations.

Design to operation plan


ETAP Multi-Dimensional Foundation unifies design engineering and real-time applications enabling digitization of power systems at every stage of the electrical installation life cycle, from design and build to commission, operate, and maintain. ETAP enables efficient design, analysis, management, operations, and a complete digital transformation of projects, while adapting to evolving system changes, accelerating productivity, and increasing efficiency while lowering total cost of ownership (TCO).


Multi-dimensional Digital Twin Platform


Challenges, Trends & Solution

An innovative design alone does not ensure a well-built data center that will remain efficient and reliable throughout its life cycle. For each phase, proper care and action are required to meet the mission-critical facility's business needs continuously.

Planning

Faster Planning & Modeling

Design

Accurate Design & Analyses

Confident

Confident Build & Commissioning

Intelligent

Intelligent Management & Operations

Connect

Connected Assessment & Maintainenace

Inform

Informed Transformation & Growth

Adapt

Adapt Renewables & Decarbonize

swipe

Swipe to view more

Picture8-1

Faster Planning & Modeling for Data Center

Strong incentives exist to faster plan, build, and commission data centers. However, the common reality of tighter budgets, understaffing, uncertain and dynamic IT load, and an obsessive need for high availability makes it difficult to do this optimally. Planning mistakes & sequential tasks can magnify and propagate through later deployment phases, resulting in delays, cost overruns, wasted time, and ultimately a compromised system.

challenge

Challenges

  • Create and reuse reference designs and scale them quickly.
  • Leverage electrical system design data from pre-bid and ongoing construction data to ensure "as intended" and "as constructed" changes are synchronized.
  • Make sure to leverage data center expertise within an organization and collaborate with the entire team on the same electrical model.
  • Ensure to include multiple disciplines, including electrical, thermal, mechanical, and electromagnetic, in the same software and foster data unification?
solutions

Solutions

Design a Data Center with ETAP that is fast to build and deploy

Efficient & Predictable Design

  • Template

    Templates allow for the utilization of reference, making designs data center design more efficient and predictable.

  • Auto-layout

    Connectivity Check with company-wide Rules & Auto-layout saves time & eliminates the guesswork.

BIM Interface

  • etap-revit

    ETAP-Revit bi-directional data exchange simplifies the electrical design process by utilizing the Autodesk Revit® model.

  • excad

    eXCAD™ Interface simplifies the way you design and analyze electrical systems by utilizing the blocks and attributes included in the AutoCAD® drawing.

Data Collection & Collaboration

  • excad

    Simplify data collection with etapAPP™

  • Network

    Network Project Management (NetPM™) provides a platform for collaborative engineering, using intelligent tools to shorten power system modeling and studies from months to mere weeks.


  • Digital-twin

    Connecting the ETAP Electrical Digital Twin platform to a larger ecosystem of complementary and collaborative solutions, we can enable a transformative role for customers to design, operate, and connect on a multi-disciplinary scale.

Picture7-1

Accurate Design & Analyses for Data Center

Asset criticality, capacity, and growth plan must be considered when designing a data center. Multiple operating conditions have to be created, analyzed, stored and recalled for optimizing equipment dimensioning and evaluating network resiliency and safety, based on country-specific codes & standards.

challenge

Challenges

  • Maximize critical power distribution utilization without overloading the circuits or jeopardizing the intended redundancy design?
  • Verify that breaker trip settings are correct and adequately coordinated as per the power system design and avoid a cascading failure.
  • Protect operational staff from injury by determining the proper PPE level and identifying gaps in the protection systems.
  • Calculate & verify the system uptime.
  • Protect equipment from overvoltage and overheating due to harmonics generated from UPS, SMPS, ASD, etc.?
solutions

Solutions

Analyze a Data Center with ETAP accurately leveraging a full-fidelity model

Sizing & Dimensioning

  • Dimensioning of equipment & cables

    Dimensioning of equipment & cables using multiple codes and standards, including voltage drop, fault current, harmonics, motor starting, and other operating conditions.

  • Cable Thermal

    Integrate Cable Thermal, Cable Pulling & Cable EMC in the same electrical system model eliminating the need to maintain multiple software and data models.

Simulation Result Analyzers

  • Multi-Dimensional Database

    Unified with Multi-Dimensional Database enabling user-friendly visualization and management of design, and revisions or changes.

  • Multi-Result Analyzers

    Multi-Result Analyzers, Plot analyzers, Data Managers & Protective Device Settings Reports allow comparing "As designed" and "As revised conditions." 

Redundancy & Availability

  • UPS configuration

    Analyze parallel UPS configs with Load Flow & Short Circuit, Protection & Selectivity, & Arc Flash.

  • Power Quality & Harmonic

    Ensure Power Quality & Harmonic compatibility and selection with correct harmonic mitigation techniques & harmonic filter sizing.

  • Contingency analysis

    Use Contingency Analysis and Reliability Assessment to determine redundancy performance, for MTBF, MTTR & COI.


Picture13-1

Confident Build & Commissioning for Data Center

No matter how experienced an operator or a commissioning engineer is, a new site or design can constantly challenge them with abnormal situations not considered during the electrical power system design & analysis. Changes in and commissioning sequence can get them into a position where it becomes imperative to validate an action before commissioning or operating the system.

challenge

Challenges

  • Ensure that new changes do not introduce unwanted behavior.
  • Simulate procedures, outage scenarios & test adequacy of remedial actions before establishing procedures for operators?
  • Reuse data captured during the actual data center commissioning process.
  • Train operators to execute the impact of pre-defined & ad-hoc switching plans to successfully exit emergency or unforeseen operating conditions?
solutions

Solutions

Commission & Handover a Data Center with ETAP Risk Aware Validation & OTS

Software-in-the-Loop

  • Software-in-the-Loop

    Test Network Operations Center start-up and emergency procedures with or without eSCADA connection using ETAP Software-in-the-Loop Dynamic Simulation.

Operator Training Simulator

  • eOTS

    eOTS promotes continuous operator training enabling them to leverage engineering tools, gain insight into the performance signature of the data center as it transitions to full-scale operations, and validate new control strategies.

Protection & Asset Management

  • eProtect

    eProtect centralized protection and asset management system ensures protective device settings are transcribed to the field devices correctly and made available to all resources responsible for the safe & successful commissioning of the data center.


Picture12-1

Intelligent Management & Operations for Data Center

The number one cause of data center failure is human error. With so much at stake for Data Center owners/operators and their tenants, making the right decisions quickly and confidently is imperative.

36%

data center outages are power-related

$5.6K/min

avg. outage costs resulting in $140K to $540K / hour loss

31%

experienced a downtime incident over a 12 month period

48%

reported at least one outage over a 3 year period
* based on 2018 Survey by Uptime Institute

challenge

Challenges

  • Validate the design model and ensure the 'digital design twin' transforms into the 'digital operations twin' for current and future decision-making.
  • Bring risk awareness into my operations and prevent erroneous actions that may cause a cascading trip or increase demand-cost?
  • Quickly analyze an unforeseen event and understand whether the operator or the automatic system protection responded as intended.
  • Determine the loading requirements for non-metered devices and manage the demand at each Power Distribution Unit (PDU?)
solutions

Solutions

Bring Situational Awareness to the Data Center with ETAP Predictive Analysis

Intelligent & Reliable Power Management

  • ETAP eSCADA & ETAP PSMS

    ETAP eSCADA & ETAP PSMS transforms a Data Center EMCS into an intelligent and reliable power management solution for operators, dispatchers, engineers, and decision-makers with crucial metrics including DCIE, PUE, etc.

  • Continuously leverage

    Continuously leverage existing measurements and extrapolate pseudo-measurements to gain complete system visibility using ETAP State & Load Estimation.

"What if"
Predictive Analysis

  • Engineers & operators

    Engineers & operators can run any "What if" scenario using ETAP Predictive Analysis based on real-time operating conditions, be notified of the risk, and enhance their decision-making.

  • Automated Fault Analysis System

    Utilize Automated Fault Analysis System for faster analysis response to interruption incidents, enabling you to identify the fault type and its location and compare the sequence of operation with the "as designed" system.

Event Playback

  • Event Playback

    Effective post-mortem & Event Playback capabilities allow you to replay the events, understand system & operator actions, and explore alternative measures.


Picture11-1

Connected Assessment & Maintenance for Data Center

An ounce of prevention is worth a pound of cure—or in this case, millions of dollars. Apart from the immediate financial costs, the impact of reduced productivity, lost opportunities, brand damage, and potential data loss can impose lasting trickle-down effects that may affect a business for years to come. Data centers can leverage their digital twin model to identify and avert potential failure points, saving both themselves and their customers time and money. 

challenge

Challenges

  • Prevent unexpected failures in underground cables, etc.
  • Anticipate failures, predict the remaining lifetime, and accurately schedule preventive maintenance to prolong hardware life.
  • Identify cascading impacts of an impending failure.
  • Ensure that I am meeting grid compliance in terms of power quality.
  • Lower energy bills, avoid penalties, and continually harvest power savings.
solutions

Solutions

Bring Situational Intelligence to the Data Center with ETAP eSI

Situational Intelligence

  • Situational Intelligence

    Situational Intelligence (eSI) allows for continuous assessment of various contingencies in the network, providing insight into the redundancy & reliability status of the system in real-time. 

Harmonic Power Quality

  • Monitor harmonic

    Monitor harmonic power quality, draw baseline from 'as designed' vs. 'as expected' vs. 'as operating,' and evaluate harmonic mitigation performance using ETAP PQMS.

Real-Time Reliability Assessment

  • ETAP Real-Time

    ETAP Real-Time Reliability Assessment helps analyze alarms and root causes and take meaningful actions based on a probabilistic failure model.


Picture10-1

Informed Transformation & Growth for Data Center

Typical data centers are designed with a life expectancy of 10 to 15 years. However, most IT equipment refresh cycles are 2 to 5 years. Datacenter operators need to scale critical infrastructure (power and cooling) and space to accommodate explosive growth in computing power and storage. Critical power needs to be deployed modularly within an operating data center while it remains fully operational and reliable.

challenge

Challenges

  • Utilize real-time data to analyze the impact of load growth & system changes
  • Select & test between various equipment
  • Identify cascading impacts of an impending failure
  • Maximize my current facilities to meet demands?
solutions

Solutions

Leverage ETAP Digital Twin for Design & Operations

Model Validation

  • ETAP Electrical Digital Twin

    ETAP Electrical Digital Twin may be expanded while you continue to operate the electrical network and test the impact of changing single or multiple pieces of equipment. 

System Visibility

  • Utilize ETAP Revisions

    Utilize ETAP Revisions combined with Real-Time or Archived Data to rerun the original set of scenarios or add new scenarios to the existing list to evaluate and assess during design & operations.

Energy Efficiency

  • Energy Accounting

    Compare as-configured maximum potential demand vs. current actual demand, as configured potential supply and actual current supply including Energy Demand, using Energy Accounting for Energy Demand & Tenant Billing.

  • Directly use real-time data

    Directly use real-time data to evaluate the impact of adding servers on various PDUs while factoring multiple system-level capacities - active, idle, stranded, spare, and safety margins (off-limits).


Picture9-1

Adapt Renewables & Decarbonize for Data Center

Sustainability is becoming a vital issue for data center operators. Investors, customers, and legislators are increasingly demanding carbon emissions reporting and 100% renewable energy use. Purchasing Renewable Energy Certificates (REC) or Power Purchase Agreements (PPA) is a reasonable first step in a sustainability strategy towards Carbon Neutral, yet is insufficient on its own. While a virtual PPA may make a new renewable farm possible, if the farm and the data center operations are not on the same grid, it does not address carbon emissions from those operations. Data centers must move to Net Zero and deploy renewable sources of energy on the local grid, so that the data center will consume renewables at all times.

challenge

Challenges

  • Design & operate my data center to be Net Zero with local renewables
  • Participate in energy arbitrage leveraging energy storage & onsite generation?
  • Correctly understand the combined impact of mixed unbalanced AC & DC systems and renewable energy assets on a time-domain basis.
  • Simulate and manage microgrid controls from design into operations and derisk the project.
solutions

Solutions

Leverage ETAP Renewable Energy Modeling & Microgrid Control from Design to Operation

Net Zero

  • Leverage renewable energy

    Leverage renewable energy modeling including; solar, wind, energy storage & var control devices from design to operations using ETAP Time Domain Unified AC & DC Power Flow.

Sustainability

  • microgrid

    ETAP Microgrid Control offers an integrated model-driven solution to design, simulate, optimize, test, and control microgrids with the inherent capability to fine-tune operations logic, during the design phase for maximum system resiliency and energy efficiency.

Energy Arbitrage

  • ETAP Load and Generation Forecasting

    Leverage ETAP Load and Generation Forecasting to predict data center load demand and generation availability to participate in energy arbitrage.


 

 

ETAP Solution Summary

ETAP provides a comprehensive digital twin based solution from Design to Operations. ETAP integrated single platform solution allows for a data center facility power system within the safety and regulatory compliances. Further, it leverages the design knowledge with operations data to drive continuous risk assessment, situational intelligence, and remedial actions.


Planning & Design

  • Network Analysis

    Network Analysis includes modules such as Short Circuit, Load Flow, Arc Flash, Motor Starting and more.

  • Protective Device Coordination

    Integrated Protective Device Coordination software

  • Low Voltage Cable Calculation

    A complete solution for your cable system needs

  • Data Exchange icon

    Data exchange interfaces and power system model conversion tools to import and export via different formats.

  • Electrican with PPE equipment and Arc Flash Labels, one-line diagram with printed results, and TCC curves

    Arc Flash software identifies and analyzes high risk arc flash areas in AC systems.

  • dc-arc-flash-software

    DC Arc Flash module calculates the incident energy for direct current networks.

  • NetPM

    Save hundreds of work-hours by this efficient new multi-user platform for project execution and management.


Operations & Maintenance

  • eSCADA

    Distribute SCADA technologies with intuitive real-time visualization and analyses platform - eSCADA™

  • Power System Monitoring & Simulation

    Power monitoring system and analytical tools to predict system response.

  • Microgrid Controller

    Integrated software solution to monitor, predict and manage diverse power sources and multiple operating conditions.

  • ils-conroller

    ETAP iLS dynamically and instantaneously determines the best load shedding priority.

  • eProtect

    Communicates with relays and ETAP Protection & Coordination modules to manage location, information & settings over the entire relays & electrical assets' lifecycle.

  • eots-banner

    This cloud-based application communicates with relays and ETAP Protection & Coordination modules to manage settings over the entire relays & electrical assets lifecycle.

 

 

Featured Webinars

View all webinars
 

AC Arc Flash Analysis for a Datacenter Network in Italy to determine the PPE for Workers using ETAP

17:04
Arc Flash Analysis was performed on a new datacenter building in Italy, calculating Incident Energy and Arc Flash Boundaries at several locations, from the main 15kV distribution switch gears down to the main LV distribution switchboard and diversionary panel boards in each segment. The studies were performed using ETAP Arc Flash software to identify the correct personal protection equipment (PPE) for engineering staff during maintenances operations. Standards applied include: NFPA 70E-2021, IEEE 1584-2018, IEC 60909 (2016).

GreeNext to Provide Sustainable and Resilient Energy-as-a-Service, in Collaboration with ETAP

19:50
This presentation introduces GreeNext, a joint venture providing sustainable and resilient energy solutions to commercial and industrial customers through solar and battery hybrid microgrid technology. Learn how and why GreeNext will utilize ETAP Software and controller hardware to increase deployment speed and provide an additional layer of reliability for Data Centers.

Powering IT/OT Convergence for DC Management in Data Centers with ETAP

21:26
Electrical infrastructure can only be managed by including both equipment and data. Transforming electrical data to information and knowledge for decision-makers of mission-critical facilities requires IT-compatible software with the latest technologies’ integration capabilities. This presentation shows how ETAP enables end-users to achieve sustainable operations in their critical facilities by fulfilling OT/Site Management and IT Management requirements. ETAP’s unique features are configured with respect to data center topology and sustainable operation principles. These features are enriched as we have positioned ETAP in the corporate environment of end-users, where their corporate IT standards, services, and tools are integrated. As the title suggests, both OT and IT protocols are commissioned together, and the management of electrical infrastructure is powered by IT services via ETAP.

Analysis of power distribution network in Mission critical areas – Airports & Datacenters

11:00
ETAP Power System Software, with its various analysis modules is used to validate the design of  Larsen & Toubro Construction – Buildings and Factories projects in airports, data centers, hospitals, office buildings etc. Network Analysis, such as Load Flow and Short Circuit Calculations, ensure load shedding and voltage drop within permissible limits, Transformer Sizing Analysis is utilized to meet standard requirements. Cable Sizing and Cable Pulling Modules, along with UG Thermal Analysis modules, validate cable routing at various underground locations. These tools allow for easy planning and approval at the initial project stage. On Safety and Protection – STAR curves help to find the correct protection and selectivity for prestigious projects with critical operations such as airports, data centers, office buildings and hospitals, to ensure smooth power flow without interruptions. Arc Flash Modules help us to quickly create & define Arc Flash Labels, as well as PPE requirements. Ground Grid Analysis is used for effective and economical earth mat design and sizing. Reliability Assessments are part of the design process to ensure the AIDI and CAIDI reliability metrics. Harmonic Analysis, for the sizing of active and passive filters allows for fine-tuning of filter design at the right locations.

Critical Power Solutions​ for Data Centers

20:45
As computing requirements continue to increase, data centers are becoming a larger portion of the total world-wide loading. It is critical that the monitoring solutions for these data centers are intelligent in order to maintain a reliable, safe, and efficient asset. During this presentation we will take a deep dive in one such data center utilizing the ETAP eSCADA / PMS solution to achieve an optimal data center.
 