Understanding Arc-Flash Calculations: Overcoming Challenges of Short-Circuit Standards

Understanding Arc-Flash Calculations: Overcoming Challenges of Short-Circuit Standards

Are you curious about the limitations of short-circuit standards and their inadequacy in addressing arc-flash incident energy calculations? In this presentation, we will review the challenges posed by these standards with an emphasis on IEC 60909-2016 and provide you with an explanation of ETAP arc-flash solutions to these limitations.

Smart City ADMS: Case Study of Egypt’s New Administrative Capital

Smart City ADMS: Case Study of Egypt’s New Administrative Capital

Cities of the future will soon account for 90% of the world’s population growth and 75% of its energy consumption. The pressure on critical resources will increase. The New Administrative Capital in Egypt launched one of the country’s most ambitious development projects to date, setting standards in smart city living is ADMS. ETAP ADMS will manage, control, visualize and optimize power distribution required to run critical smart services for city operators, citizens, workers, and visitors alike. Learn how ETAP ADMS is utilized to support long-term sustainable, efficient smart city services that will support a safer, more innovative, and more prosperous Egypt.

Phase to Phase Fault Debacle: Fault Lasted 1.7s/108 Cycles. Protection Studies are quite Challenging

Phase to Phase Fault Debacle: Fault Lasted 1.7s/108 Cycles. Protection Studies are quite Challenging

How a failure, to properly perform protection studies, led to a significant substation safety incident and outage. ​Understanding minimum and maximum fault current values are critical in this case study. The shortcomings led to a fault not being removed fast enough.  Short circuit impedances are very valuable, it is critical to have the right cables and impedances of the equipment. An excellent learning from this case study is that line to line arc flash fault exists much longer at medium voltage level. In low voltage we do not see those type of line-to-line arc flash faults because line to line arc flash fault will rapidly turn into a three-phase fault. The arc flash calculator is a great tool to estimate incident energy.  The arc flash calculator shows both methods:  below 15 kv we can use IEEE 1584-2018 to calculate incident energy at 15 Kv, and above our fault calculated method can calculate calories exposure during the fault.

Methods for Evaluating DC Arc Incident Energy in PV Systems

Methods for Evaluating DC Arc Incident Energy in PV Systems

Renewable energy systems continue to be one of the fastest growing segments of the energy industry. This presentation focuses on the understanding of how photovoltaic (PV) technology behaves under dc arc conditions. A comparative analysis of the arc flash incident energy calculation method developed in collaboration between National Renewable Energy Laboratory (NREL) and ETAP details the effect of PV module I-V and P-V curves under arcing conditions. Examples of the application of the proposed calculation method to the test measurements are included.

ETAP Intelligent Distribution Load Shedding - iDLS - Solution Demonstration

ETAP Intelligent Distribution Load Shedding - iDLS - Solution Demonstration

The ETAP iDLS solution leverages advanced technologies such as artificial intelligence and machine learning to provide accurate predictions of load demand and provide real-time operational insights to help grid operators make informed decisions. Additionally, iDLS integrates with existing grid infrastructure and control systems, making it easy to deploy and integrate into existing power systems. By providing a centralized load management solution, iDLS helps ensure grid stability and continuity of power supply, while minimizing the impact on connected customers and preventing blackouts and unplanned outages.

How to Easily Migrate  from Legacy Software Projects to ETAP

How to Easily Migrate from Legacy Software Projects to ETAP

In this webinar, we demonstrated how easy it is to convert to ETAP 22 from various legacy software applications using the most advanced built-in data conversation tool. We also explored many of the new features & capabilities in ETAP 22 and revealed tips and tricks for the best ETAP experience.

How to perform protection & coordination studies for traction systems with ETAP's StarZ module

How to perform protection & coordination studies for traction systems with ETAP's StarZ module

ETAP Train Power Simulation - eTraX™ software includes validated, user-friendly and flexible software tools for designing, analyzing and managing AC and DC railway infrastructure. Learn how eTraX integrates with ETAP protection & coordination software (StarZ) to offer insights into line protection, protective relay performance & evaluation, troubleshooting false trips, and system-wide protective device operation.

ETAP 22 New Features brochure

ETAP 22 New Features brochure

ETAP 22 offers an impressive new set of integrated power analysis modules, electrical dimensioning capabilities, automation, and operations solutions.