検証ケースと比較結果のサンプル
ETAP は、その技術的な正確さを保証するために現場結果、実システム測定、確立されたプログラム、および手計算に対して確認され検証されています (V&V)。
ETAP の各リリースは、すべての計算モジュールに対して、数百のテストケースを使用し、完全な V&V プロセスを受けています。
以下は、各解析のために実行されるテストの種類のサンプルを提供するテストケースです。これらのすべてのケースは、ETAP のシミュレーション結果と現場測定または他のプログラムとの間に非常に密接な相互関係があることに注意してください。
-
アークフラッシュ解析
Case No. 1
Comparison of ETAP Arc-Flash Results Against IEEE Std. 1584-2018™ Published Results
This document provides an ETAP validation case. This is just one of many test case scenarios for Arc-Flash Analysis (AF) which are part of ETAP V&V program. This case is a validation case based on comparisons against published IEEE Standards on AF analysis.
Case No. 2
Comparison of ETAP Arc-Flash Results Against IEEE C2-2023 (NESC)
This document is an example of an ETAP validation test case. This case is just one of many test case scenarios for Arc-Flash Analysis (AF) which are part of the ETAP V&V program. This case is based on comparisons of ETAP ArcFault™ against published IEEE/NESC Standards.
Case No. 3
Comparison of AC Arc flash results against Hand Calculations based on DGUV Information 203-077
This VV case compares ETAP arc energy results against those published in DGUV-I 203-077 example 5.1. The comparisons include key results such as arc energy, arc power, short-circuit power and PPE levels of protection evaluation.
Case No.4
Comparison of ETAP Arc-Flash Results Against IEEE Publication
This document is an example of an ETAP validation test case. This case is just one of many test case scenarios for Arc-Flash Analysis (AF) which are part of the ETAP V&V program. This case is based on comparisons of ETAP ArcFaultTM against published IEEE publications. -
DC Arc Flash Analysis
Case No. 1
Comparison of DC Arc flash results against Hand Calculations based on DGUV Information 203-077
This VV case compares ETAP arc energy results against those published in DGUV-I 203-077 example 5.8. The comparisons include key results such as dc arc energy, dc arc power, dc short-circuit power and PPE levels of protection evaluation. -
高調波解析
Case No. 1
Comparison of ETAP Harmonic Analysis Results Against IEEE Example
This VV case compares ETAP Harmonic Load Flow results against those published in IEEE Standard 519-1992 Example 13.1, page 89-92. The comparison also includes results for harmonic indices such as RMS, ASUM, THD, TIF and TPF which were validated against hand calculations. -
ロードフロー解析
Case No. 1
Comparison of ETAP Load Flow Results Against a Published Textbook Example
This document provides a comparison of ETAP Load Flow results against published results in "Power System Control and Stability” by P. Anderson and A. Fouad.Case No. 2
Comparison of ETAP Load Flow Results Against a Published Example
This document provides a comparison of ETAP Load Flow results against published results in “Computer Aided Power System Operation and Analysis” by R.N Dhar.
Case No. 3
Comparison of ETAP Load Flow Results Against a Published Textbook Example
This document provides a comparison of ETAP Load Flow results against published results in IEEE Standard 399-1997 “Recommended Practice for Industrial and Commercial Power Systems Analysis”.
Case No. 4
Comparison of ETAP Load Flow Results Against a Published Textbook Example
This document provides a comparison of ETAP Load Flow results against published results in IEEE Standard 3002.2-2008 “IEEE Recommended Practice for Conducting Load-Flow Studies and Analysis of Industrial and Commercial Power Systems”. -
電動機始動解析
Case No. 1
Comparison of ETAP Motor Starting with Torque Control Against Hand Calculated Results
The ETAP V&V process for the Motor Starting program has over 1600 test case scenarios that are run before each ETAP release. The following cases are excerpts from the Motor Starting V&V documentation.Case No. 2
Comparison of ETAP Motor Starting Results Against Transient Stability
Comparison of ETAP Motor acceleration (MS) results against ETAP Transient Stability (TS) results which were validated against field measurements and hand calculations. -
短絡解析 - ANSI / IEEE
Case No. 1
Comparison of Short-Circuit Results against Hand Calculations based on Application Engineering Information
Comparison of ETAP 3-phase Short-Circuit results against published results in “Short-Circuit Current Calculations for Industrial and Commercial Power Systems” published by General Electric.
Case No. 2
Comparison of ETAP Unbalanced Short-Circuit results against Published values
Comparison of ETAP unbalanced fault results against published results in “Faulted Power System Analysis” by Paul Anderson, 1973, page 38-40.Case No. 3
Comparison of ETAP 3-Phase Duty Short-Circuit Calculations against Published IEEE Std 399-1997 Example
Comparison of ETAP 3-phase Duty Short-circuit results against a published 44-bus example from the IEEE Std. 399-1997, Section 7.7, pages 187-205. -
短絡電流解析- IEC
Case No. 1
Comparison of ETAP Short-Circuit IEC Calculations against Published Example
The ETAP V&V process for the IEC Short-Circuit program has over 1100 test case scenarios that are run before each ETAP release. The following cases are excerpts from the Short-Circuit IEC 3-phase and unbalanced short circuit resultsCase No. 2
Comparison of ETAP Short-Circuit IEC Calculations against Published Example
This document provides an ETAP validation case. This is just one of many test case scenarios for IEC Short Circuit (SCIEC) which are part of ETAP V&V program. This case is a validation case based on comparisons against published results in the IEC TR 60909-4:2021 document for Short-Circuit analysis. -
過渡安定度解析
Case No. 1
Comparison with Field Measurement Data for Generator Start-Up Conditions
This document provides a comparison between the ETAP Transient Stability/Generator Start-Up simulation results and field measurement data.
Case No. 2
Comparison with I.E.E. Japan (IEEJ) Electrical Power System Standard Benchmark
This document provides a comparison between ETAP Transient Stability Simulation Results and I.E.E. Japan (IEEJ) Electrical Power System Standard Benchmark.
Case No. 3
Comparison with Field Measurements from a Digital Fault Recorders
This document provides a comparison between the ETAP Transient Stability simulation results and actual fault-recorder measurements before and after a three-phase fault in an industrial system.
Case No. 4
Comparison with 9-Bus Multi-Machine System Benchmarks
This document provides a comparison between the ETAP Transient Stability simulation results and a 9-Bus Multi-Machine System Benchmark (Power System Control and Stability by Anderson and Fouad).
Case No. 5
Comparison with PTI PSS/E Simulation Results
This document provides a comparison of simulation results between the ETAP Transient Stability simulation results and PTI PSS/E program. -
不平衡ロードフロー
Case No. 1
Comparison of ETAP Unbalanced Load Flow Results Against a Published IEEE 13-Bus Feeder System
This document provides a comparison of ETAP Unbalanced Network Load Flow results against published results of IEEE 13 Node Test Feeder system.