Top Produkte
User-friendly interface for creating and managing electrical grid network visualization
Geospatial tools to better design, analyze, and expand transmission networks and situational awareness
Detailed modeling and simulation of transmission equipment for steady-state and dynamic studies
Use etapAPP™ for data collection & syncronisation, system modeling & layout
Grid Code Compliance Assessment is a process used to ensure that a power generation facility meets the technical requirements set by the grid operator.
Learn how utility engineers use ETAP’s transmission & distribution system analysis and optimization solutions to optimize capacity planning and improve reliability and safety using schematic or geospatial views. ETAP Grid™ transmission system software integrates transmission network planning with detailed substation models, network topology processing, transmission system analysis, electric SCADA and real-time transmission network energy management system. For integrated distribution network analysis, system planning and operations solution it offers a progressive geospatial platform for simulating, analyzing, operating and optimizing the performance of Utility Smart Grids.
Managing electrical networks is a complicated balancing act between equipment from various vendors, new sources of power, and the increasing need for high-quality power. The digitalization of energy systems is key to providing efficient, reliable, and safe energy. The Electrical Digital Twin represents the physical components of the electrical network. Connected to field devices, the digital twin allows engineers and operators to manage assets throughout the project lifecycle, run what-if scenarios assessing equipment response under specific conditions and analyze & optimize settings and procedures in a safe virtual environment.
The variable nature of renewable energy introduces power quality concerns, including frequency and voltage control, that may negatively impact the reliable performance of a power system. Grid codes, interconnection, or evacuation criteria must be followed during the proposed system design and continue to maintain compliance under grid-connected operation. ETAP Grid Code is a model-driven solution that includes software tools and control hardware to ensure local grid codes or standards compliance throughout the power system design and operations lifecycle.