🛒 Your basket is empty
🛒{{ model.NumberOfItems }} item(s): {{ model.Total }}
集成的交流和直流设计与分析
模型驱动的SCADA,EMS,PMS,ADMS和SAS
统一数字孪生平台设计,运营和自动化
Quick Links
ETAP’s cable capacity calculation handles both above ground (A/G) and underground (U/G in duct and buried) installations:
A Jacket in ETAP is treated as non-metallic sheath for BS 7671 based calculation. Therefore, for cable capacity calculations based on BS 7671, it is considered that the cable has a sheath layer if the cable has either a sheath layer or a jacket layer.