🛒 Your basket is empty
🛒{{ model.NumberOfItems }} item(s): {{ model.Total }}
Conception et analyse intégrées CA et CC
Model-Driven SCADA, EMS, PMS, ADMS & SAS
Contrôleurs intelligents et système de gestion
Une plate-forme jumelle numérique unifiéeConception, fonctionnement et automatisation
Filter by
Vous n'avez pas trouvé ce que vous cherchiez ? Nous sommes là pour vous aider !
98 Item(s) found
The challenges of directional protection of a wind farm collector are presented in this webinar. ETAP StarZ™ Protection & Coordination module is utilized to set and analyze protection of wind power plant collectors.
Per North American Electric Reliability Corporation (NERC), 28% of protective relay mis-operations are due to incorrect settings and logics. These errors mainly stem from the existing relay testing procedures that do not provide a proper mechanism to easily and effectively evaluate the performance of all settings, logics, and the protection system as a whole. ETAP StarZ™ is a new solution to minimize protective relay setting errors and reduce the time required to perform protection and coordination studies.
This webinar presents the fundamentals of harmonics, harmonic distortion and its sources, and related issues such as premature equipment failure or unplanned downtime. The presentation will demonstrate how to identify, analyze, and minimize or eliminate harmonics problems using the ETAP software.
This webinar covers machine fundamentals such as Conversion of Energy, Steady-State Operation, Motor / Generator, Ratings & Motor Equations, Efficiency & Power Factor vs. Loading, Motor Feeder Cable and Load Flow Solutions.
This webinar discusses the induction motor dynamic behavior for acceleration, deceleration and steady-state speed control conditions. It highlights how each of the key fundamental motor dynamic characteristics applies to different applications such as motor starting, fast-bus transfer, and motor parameter estimation and tuning.
This webinar presents the criterion and industry guidelines for protection of motors in medium and low voltage systems, typical induction motor protection schemes and suggested settings for protective devices. The application of Automated Protection & Coordination evaluation tool for design, verification, and correction of settings are also demonstrated.
In the absence of a "definitive" DC arc flash model, ETAP includes three calculation models - the "Maximum Power" method that is used in NFPA 70E, a model based on the Stokes/Oppenlander estimate of arc voltage and resistance, and a model based on Paukert's complication of research into arcing faults.
This presentation will highlight how Star Auto-Evaluation software can improve your system design, safety, reliability and operation. Validate protective device settings for equipment protection, identify mis-coordination and fix zone selectivity issues, apply industry rules for system protection & coordination and significantly increase efficiency, accuracy, and design consistency.
ETAP provides a comprehensive, integrated design and analysis solution for electric power systems. This webinar will highlight several study cases to demonstrate the software’s capabilities in LV system modeling for cable capacity, sizing and protection against electric shock, as well as reporting and project deliverables.
ETAP GRID™ is the most comprehensive enterprise solution for design, simulation, operation, control, optimization, and automation of generation, transmission, distribution, and microgrid power systems.
This webinar will highlight a case study, including lessons learned, for a commercial solar system from photovoltaic modeling to AC & DC time series power flow analysis to power monitoring and real-time predictive simulation.
Contingency Analysis (CA) is a "what if" scenario that evaluates, provides and prioritizes the impacts on an electric power system whenever typically unplanned problems or outages occur.
Learn how to save design time using the Raceway Rulebook to auto-layout cables within duct banks. Find out how to determine the optimal cable sizes, physical attributes, and maximum derated ampacity using Neher-McGrath method and IEC 287 standard.
Compliance requirements of NFPA 70E - 2015 Edition using ETAP 14 Arc Flash Analysis: Compliance with the Latest Standards and Guidelines, New AC and DC Arc Flash Modes, Study Case, and Interface Arc Flash Analyzer Enhancement, New Sequence-of-Operation for IEC Arc Flash, New Enclosure Isolation for Main & Load Protective Devices, New Correction Factors for Arc Current and Incident Energy.
Datablock provides smart, customizable templates for convenient graphical presentations of the system information.
This webinar introduces the benefits and need of a fast and intelligent load shedding system. ETAP ILS™ is a model-driven load shedding system with predictive solutions optimization techniques that improves response time and makes fast, optimum, and reliable load shedding decisions, i.e., instantaneous response to disturbances, loss of generation, unplanned outages, and restoration.
ETAP’s data conversion utility provides automatic imports of power system projects created in SKM PTW, EasyPower and PSS/E. This built-in tool makes it easy to convert the one-line diagrams, electrical data, and protective device settings and TCC curves into ETAP.
Auto-Build is a new powerful feature in the ETAP 14 release that provides rule-based automated designs that enable engineers to significantly reduce the amount of hours spent on creating a one-line diagram.