통합된 AC & DC 설계 & 해석
모델 중심의 SCADA, EMS, PMS, ADMS & SAS
우수한 기능의 제어기 & 관리 시스템
A Unified Digital Twin Platform설계, 작동 및 자동화
According to the latest NFPA 70E “Standard for Electrical Safety in the Workplace”, work permits may be required when performing electrical work on energized equipment. Electrical work permits include shock hazard and arc flash analysis results. Annex J of the NFPA 70E standard provides an example of a work permit and it also has guidelines as to when one is required based on the type of work and equipment condition. If a work permit is required, the arc flash analysis software can print one directly using the worst case incident energy results. The work permits also include other information pertinent to safe work practices and other arc flash analysis related information.
The arc flash analysis data sheet is an enhanced version of the arc flash calculation input study parameters report. It gives a detailed description of the input data and study selections made for performing the Arc Flash Analysis Studies. The arc flash analysis data sheets are a great way to communicate all the calculation assumptions used by the engineer to obtain the arc flash results for any location.
Arc Flash Work Permit & Data Sheet