Thank you for requesting a quote!

A representative will contact you shortly.

Useful Resources

Industrial Plant Electrical Risk Management Program

oct. 17, 2022, 17:00
Duration : 12:33
External URL : https://www.youtube.com/embed/khVD43HBpcY
The Electrical Risk Management (ERM) group at FTI uses ETAP to provide short circuit, coordination, and arc flash studies as a part of building a safety program for industrial facilities around the US and Canada. This presentation will describe our approach to an overall safety program and the ways that a safety program encompasses more that just an engineering study. Some topics to be discussed are the need for maintenance personnel to understand the labeling, assessing the risk vs. just looking at the label, the choice between full coordination and arc flash hazard, field verification, and bolted fault current vs arcing fault current as it relates to equipment evaluation. We will look at the ETAP model of one of our industrial customers and discuss the benefits of using ETAP for our studies – reliability, adaptability to many systems by using configurations and scenarios, wizards, availability of DC and MV calculations, Star TCCs, ease of exporting reports to Excel, and solar and wind sources capability.
Categories :
  • Étude de Cas
Tags :
  • Safety
Watch how ETAP can help in your industry sector

Industrial Plant Electrical Risk Management Program

oct. 17, 2022, 17:00
Duration : 12:33
External URL : https://www.youtube.com/embed/khVD43HBpcY
The Electrical Risk Management (ERM) group at FTI uses ETAP to provide short circuit, coordination, and arc flash studies as a part of building a safety program for industrial facilities around the US and Canada. This presentation will describe our approach to an overall safety program and the ways that a safety program encompasses more that just an engineering study. Some topics to be discussed are the need for maintenance personnel to understand the labeling, assessing the risk vs. just looking at the label, the choice between full coordination and arc flash hazard, field verification, and bolted fault current vs arcing fault current as it relates to equipment evaluation. We will look at the ETAP model of one of our industrial customers and discuss the benefits of using ETAP for our studies – reliability, adaptability to many systems by using configurations and scenarios, wizards, availability of DC and MV calculations, Star TCCs, ease of exporting reports to Excel, and solar and wind sources capability.
Categories :
  • Étude de Cas
Tags :
  • Safety