329 Item(s) found

Remedial Action Scheme for Integrated G-T-D System

Remedial Action Scheme for Integrated G-T-D System

Due to system shutdowns stemming from drastic frequency decline associated with the loss of relatively large generating units, Fortis TCI embarked on exploring opportunities to curtail these events to improve system response. This was achieved through detailed modeling and validation of system parameters with event data gathered from previous events.  Carefully implemented Remedial Action Schemes are currently explored to provide cost-saving benefits; significantly improving frequency response, without the need for larger spinning reserves and minimize investment costs for BESS.

Enterprise Asset Management & Automated Fault Analysis

Enterprise Asset Management & Automated Fault Analysis

Solution introduction & case study presentation. Remote Management of Protection Relays  - Improved Productivity & Compliance Benefits. This presentation aims to define and demonstrate the importance of the remote management of protection relays in large power system networks. A protection system is vital for network security and reliability. A centralized system should aim to get each protection relay setting, records, logic, and status quickly and efficiently so that all these data can be analyzed, managed, and utilized. In OETC grid stations, there are more than 4000 protection relays installed.  OETC network is rapidly expanding every year. There are incidences of tripping due to various reasons. These isolated equipment restorations can be done faster if protection relays fault records, events retrieved through remote access. ETAP and OETC are jointly working on conceptualizing and implementing a fully functional system for remote relay access and data retrieval – eProtect. This presentation discusses the technical requirements, networking solutions, cybersecurity requirements, features, testing, validating system requirements, and detailed benefits. Challenges faced during implementation will be discussed together with their resolution.

Enhanced End-to-End Real-Time SILHIL Workflows with ETAP and ePHASORSIM

Enhanced End-to-End Real-Time SILHIL Workflows with ETAP and ePHASORSIM

The ETAP/ePHASORSIM hybrid power system solution is ideally suited for installing and certifying any new device on the grid for protection, monitoring and control, thus reducing risk and costly commissioning time—as well as validation of reliability and security of any transmission, distribution and generation grid before implementation. Users can simulate SIL and HIL scenarios in real time, greatly reducing time-to-market. We will demonstrate the time-savings and value of this solution by exporting an ETAP model to ePHASORsim and controlling it in closed-loop with ETAP’s controller hardware.  To fine-tune the response, we will change the ETAP model, export again, the re-start the simulation—a cycle commonly observed in testing environments.

Microgrid Design & Analysis

Microgrid Design & Analysis

Microgrid Analysis & Design is an essential step for Microgrid Implementation. Upfront design and analysis of the target microgrid system, whether for brownfield or green-field Microgrid implementation, can help drive both technical and financial benefits, including determining optimized generation assets required to meet the microgrid objectives as well as a projection of return on investments. Analysis & design from safety, reliability, and financial perspective are critical for successful microgrid implementation to minimize the impact and rework during the installation phase. This presentation will provide recommendations on best practices for Microgrid Analysis & Design.

Parte 1 - Recopilar y sincronizar datos de campo de manera efectiva

Parte 1 - Recopilar y sincronizar datos de campo de manera efectiva

Aprenda a ver, crear, editar y compartir diagramas unifilares ETAP y datos de ingeniería en dispositivos móviles y de escritorio, en cualquier momento y en cualquier lugar. Simplifique la verificación y validación de sus datos mientras está en el campo y sincronice con ETAP directamente a través de la comunicación inalámbrica.

Unit Capability Validation, an Analytical Approach for MOD-25 Compliance

Unit Capability Validation, an Analytical Approach for MOD-25 Compliance

It is crucial to define the reactive power limits to evaluate the voltage support available under normal, abnormal and emergency operations with the unit's safe functioning. Published generator thermal capabilities curves, produced by the manufacturer, define the limits for safe operation based on the generator design's thermal limitations. Practically, the available reactive capability differs from the published equipment curves due to plant specific design and operating constraints. This presentation discusses a theoretical approach utilizing a simplified electrical distribution system and an ETAP model to identify and validate the plant-specific unit capability. 

Planning, Design, and Validation of a Microgrid using ETAP Digital Twin Platform

Planning, Design, and Validation of a Microgrid using ETAP Digital Twin Platform

The implementation of a Microgrid involve several stages, in which the engineer has to deal with the interaction of different processes and dynamics, taking into account the different modes, topologies and scenarios that the system could possibly have. This is the case of an ongoing project for an important Grid operator in Colombia, in which PTI S.A and OTI are working together to deliver a comprehensive Monitoring and Control system for an entire Microgrid, comprised of different energy resources as Diesel, Solar, Batteries and a connection to the Public Grid. Project stages involve Planning, Design, Validation, In site Deployment and Testings, and for that purposes, Etap PS/RT and Opal RT solutions will be used, on a Digital Twin Platform environment.

Autoevaluación de Arco eléctrico

Autoevaluación de Arco eléctrico

La autoevaluación de arco eléctrico ETAP le permite evaluar rápidamente la energía incidente del arco eléctrico con un estudio automatizado de coordinación de dispositivos de protección para reducir significativamente las modificaciones costosas y los equipos de mitigación. El webinar demuestra la evaluación automática de las parcelas del área C y los puntos de daño del equipo.

HV Arc Flash Studies for one of the Largest Utilities in South America

HV Arc Flash Studies for one of the Largest Utilities in South America

This presentation focuses on HV arc flash hazard analysis, as part of a multi-voltage AF study (115, 34.5, 13.8, and 0.22 kV) for one of the three largest utilities in South America with hydro and renewables generation and T&D. It demonstrates the versatility of the ETAP ArcFault™ to assist in the calculations and estimates of electric arc currents and incident energy level for HV substation equipment. The presentation discusses how ArcFault study results were used to select engineering and administrative control strategies, personal protective equipment (PPE), changes in protection schemes and adjustments to reduce electrical risks in operation & maintenance of electrical T&D systems. 

AC Arc Flash using IEEE 1584 - University Campus Case Study

AC Arc Flash using IEEE 1584 - University Campus Case Study

Since the release of IEEE 1584-2018, the industry has been challenged to reach a consensus on applying the new standard. The most significant application “pain” so far has been identifying actual equipment data for input to the study, including bus gap and electrode configurations in the equipment. A case study of an arc flash analysis for a large university campus with MV and LV power distribution equipment of different types, vintages, and manufacturers is presented. The presentation highlights selection of electrode configuration(s) for various equipment types and voltage levels and correct application of arc current and enclosure size correction factors to significantly reduce the data entry time and effort. The presentation will cover upcoming IEEE P1584.1 revisions to apply IEEE 1584 for arc-flash hazard calculations directly from the revision subgroup chair.