113 Item(s) found

Powering the Mine

Powering the Mine

Intergraph® SmartPlant® Electrical working with ETAP® can help to achieve business objectives and offer a unique solution in the market of engineering, design, validation of data, construction support, commission, and operations.

ETAP Nuclear Generation Plants

ETAP Nuclear Generation Plants

The ETAP Nuclear License is used throughout the world by nuclear generation plants, research laboratories, consulting firms, government agencies, etc.

Real-Time Energy Management

Real-Time Energy Management

ETAP Real-Time is an energy management software application that runs as an operator workstation to monitor, control, and optimize the operation of your power system, while simultaneously serving as an engineering workstation capable of utilizing real-time data to perform full spectrum power system analyses.

Optimal Capacitor Placement

Optimal Capacitor Placement

Optimal Capacitor Placement - Costs Benefits Due to Loss Reductions

Implementation of a Switched Capacitor Control Scheme

Implementation of a Switched Capacitor Control Scheme

This white paper discusses the implementation of a voltage control switch capacitor scheme by means of the user-defined dynamic modeling (UDM) tools in ETAP.

Medium Voltage Controllable Fuse

Medium Voltage Controllable Fuse

This white paper provides a comprehensive discussion of the modeling of Mersen’s medium voltage controllable fuses (MVCF) in ETAP.

Aclimatación de la utilidad tradicional a la utilidad inteligente

Aclimatación de la utilidad tradicional a la utilidad inteligente

This presentation will provide an insight on the justification, objectives, and implementation of SCADA, DMS and OMS integrated system using ETAP ADMS solution at the NPCL Utility in India.

ETAP - Interfaz OPAL-RT

ETAP - Interfaz OPAL-RT

In this presentation we showcase the hardware-in-the-loop simulation testing procedure of one of ETAP’s real-time smart grid solutions, AGC (Automatic Generation Control). The ability of AGC to respond to varying operating conditions on the grid is demonstrated and the set-up enables testing under several “what-if” scenarios.

Implementación de eSCADA en las instalaciones del centro de datos

Implementación de eSCADA en las instalaciones del centro de datos

Esta presentación del centro de datos 101 explora cómo se usa ETAP para diseñar un sistema de energía en un centro de datos, cómo se realizó la energía dentro del centro de datos, brinda una descripción general del proyecto, la colaboración con ETAP y resume las lecciones aprendidas en el proceso.

Diseño e implementación del sistema de deslastre de carga ETAP en la planta siderúrgica de Hyundai

Diseño e implementación del sistema de deslastre de carga ETAP en la planta siderúrgica de Hyundai

This presentation will discuss the steps in system design as well as the justification and implementation of ETAP Intelligent Load Shedding (ILS) system at Hyundai Steel, Incheon plant.