etap 2024 logo

测试版

可持续发展通过
持续智能

注册以访问测试版


注册以访问测试版

什么是新的
2024 年 ETAP

贝塔1

我们很高兴推出 ETAP 2024 的 Beta 1 版本,集成设计和操作 解决方案采用新的用户界面,旨在最大限度地提高效率、增强 生产力,并简化整体用户体验。

这次重大更新带来了新鲜和现代的设计 - ETAP 设计和命令的新面孔和命令范例。运营解决方案 - 重新构想您与我们行业领先的软件的交互方式。

现代功能区界面,统一意图和功能命令

基于功能区的用户界面将用户意图和命令结合在一起,确保无缝、直观的体验。


定制您的用户环境

Request Beta Release & User Support

A complete list of all enhancements in ETAP
are listed on the What’s New page.


How ETAP was utilized to expand the Electrical System at the Tailings Dam Copper Mine in Peru

10月 17, 2022, 17:06 下午
Duration : 14:07
External URL : https://www.youtube.com/embed/1SpfrjNs9L4
As part of their Tailings Dam Expansion project, a large copper mine in Peru required to have several studies performed in their electrical system. As loads were added and the topology of the system was changing, the client wanted to ensure that their electrical system would be able to handle the new loads and operate reliably and efficiently. Electro Integra S.A.C. was hired to perform Load Flow, Short Circuit, Relay Coordination, Motor Starting and Optimal Capacitor Placement studies. ETAP was used as the tool to perform all the studies because the client has been using ETAP for over 20 years.
Since 2000, Electro Integra has partnered with ETAP to bring their software solutions to the Peruvian market. Continuous development and investment in ETAP Solutions has kept them as the de facto standard for power system analysis for all types and sizes of electrical industries.
Categories :
  • 案例研究
Tags :
  • Featured Home

请求 Beta 1 发布并发布用户支持

ETAP 中所有增强功能的完整列表
列于最新消息页。



登录或注册以请求测试版发布

  • 登录
  • 报名