etap 2024 logo

Versión Beta

Sostenibilidad mediante
Inteligencia continua

Regístrese para acceder a la versión beta


Regístrese para acceder a la versión beta

Novedades
en ETAP 2024

Beta 1

Nos complace presentar la versión Beta 1 de ETAP 2024, diseño y operación integrados con una nueva interfaz de usuario diseñada para maximizar la eficacia y mejorar la productividad. productividad y simplificar la experiencia general del usuario.  

Esta importante actualización aporta un diseño fresco y moderno - la nueva cara y paradigma de mando para ETAP Design & Operate Solutions - reimaginando la forma de interactuar con nuestro software líder en la industria.

Interfaz de cinta moderna, unificando intención y comando

Garantice una experiencia fluida e intuitiva con una interfaz de usuario basada en cintas que aúne la intención del usuario y el mando.


Personalice su entorno de usuario

Request Beta Release & User Support

A complete list of all enhancements in ETAP
are listed on the What’s New page.


Integrated Stability & Protection Sequence of Operation

nov. 8, 2021, 18:18
Duration : 22:39
External URL : https://www.youtube.com/embed/J7TvIMuzjuo
Many protection functions such as over/under frequency, out-of-step, generator loss of excitation are set based on power system dynamic characteristics. These protection functions were conventionally set with the assumption that, system dynamics are predictable using simplistic and aggregated models. Higher penetration of distributed energy resources (DERs) has made power system dynamics considerably more complex to predict through conventional approaches. ETAP offers a new solution to perform unified protection and transient stability study to accurately capture interactions between system dynamics and protection system. This solution allows protection engineers and network planners to 1- tune protection settings to act properly during system dynamics, 2- design and test remedial protection schemes, 3- evaluate all protection functions such as out-of-step, overcurrent and generator loss of excitation protection function and 4- perform grid code studies that require evaluating DER performance along with its protection system.
Categories :
  • Estudio de caso
Tags :

Solicitar la versión Beta 1 & Asistencia al usuario

Lista completa de todas las mejoras de ETAP
figuran en la Novedades página.



Inicie sesión o regístrese para solicitar la versión beta

  • Conectarse
  • Inscríbete