2 Item(s) found

Applying ETAP to Calculate, Analyze and Install BESS in the Vietnam Power System

Applying ETAP to Calculate, Analyze and Install BESS in the Vietnam Power System

This case study presented by Vu Duc Quang, Deputy Director of Training, Research and Development Center, at PECC2 in Vietnam, explains how peaking electricity consumption in North - and high penetration of renewable energy sources in South Vietnam pose great pressure on the grid. PECC2 utilized ETAP to model Vietnam's power system, calculate and analyze power systems scenarios, identify the optimal location and install capacity of Battery Energy Storage Systems, based on the criteria of reducing/avoiding overload of the power grid and peak shaving. This presentation will demonstrate how BESS solutions with capacity and location calculated with ETAP have shown a clear effect in reducing the power system’s overload.