Unit Commitment

Unit Commitment

Unit Commitment

Designed to minimize operating cost and improve life time of generation units
Monitors generation operating condition, running hours, maintenance schedules, etc. to determine which generators should be started\stopped to meet defined objectives.
Unit Commitment Schedule

In Forecast mode, the ETAP Unit Commitment will look at the forecasted load in the system and determine the operating schedule for each of the units hourly taking into account startup, ram-up times as well objectives mentioned above.

Unit Commitment Key Features

The following objective can be achieved in ETAPUnit Commitment

  • Minimize Fuel Cost (Efficiency)
  • Minimize Current Running Hours
  • Minimize Total Running Hours after Maintenance
  • Minimize Total Running Hours after Installation
Unit Commitment

Videos

Literature

White Papers

 

 

Trainings & Events

ETAP Training

Trainings & Events

Get an in-depth insight to our electrical engineering software by requesting a training course that suits you.

Discover Now

Try_demo_banner

Push the boundaries of what's possible
with ETAP Software

Keep up with demand, reduce error and waste, and accelerate
efficiency with the power of AI. Arc Flash is available in our software
and native to Design and Make Platform to help you reach new levels
of innovation and creativity.