ETAP Digital Twin Solution for Data Centers

ETAP Digital Twin Solution for Data Centers

1:13:51 Webinars

Smart Data Center Solutions for integrated power system modeling, analysis, and simulation have become critical in design and operation of Data Centers. Making proper design decisions early on during the system planning stages is paramount for energy efficiency strategies, reducing the total cost of ownership and improving the reliability of engineering and facility operations. In this webinar, we will present ETAP's Digital Twin solution for integrated design, analysis, real-time predictive simulation, and operation of Data Centers.

Continuous Intelligence - Design & Operation

Continuous Intelligence - Design & Operation

18:36 Webinars

ETAP Digital Twin represents virtual models of a real-world power system under various physical and operational conditions. ETAP offers an integrated Electrical Digital Twin platform enriched with intelligent solutions. ETAP Electrical Digital Twin is built on a multi-dimensional foundation, enabling efficient design, analysis, management, operations, and a complete digital transformation of projects while adapting to evolving system changes.

Learning ETAP in 5 Minutes

Learning ETAP in 5 Minutes

07:07 Tutorials

This brief video will teach you how to use ETAP in five minutes. We'll start off creating a brand new project. Adding a power source, loads, cables, breakers and relays, and then run power studies. For in-depth training on how to design and analyze with ETAP software, sign up for one of our 200+ workshops around the world: https://etap.com/events To see what's included in the ETAP Base Package, go to https://etap.com/packages/etap-base-package


ETAP 21 Release Highlights Part 2 - Monitoring, Control, Automation & Management

ETAP 21 Release Highlights Part 2 - Monitoring, Control, Automation & Management

53:45 Webinars

In this webinar, we will introduce new features & solutions for Power System Monitoring, Control, Training Simulator, Situational Intelligence, Advanced Protection, Automation Analysis & Asset Management and Digital-Twin Driven Automation & Renewable Energy Power Management.

ETAP 21 Release Highlights Part 1 - Design, Analysis & Simulation

ETAP 21 Release Highlights Part 1 - Design, Analysis & Simulation

33:55 Webinars

ETAP 21.0 offers a new set of integrated power analysis modules, electrical dimensioning capabilities, automation, and operations solutions. In this webinar, we demonstrate new Design, Analysis & Simulation Solutions & Features, plus many of the enhancements and time-saving improvements.

Design & Operate - Continuous Digital Twin Journey

Design & Operate - Continuous Digital Twin Journey

56:04 Webinars

ETAP Digital Twin is an integral building block in all stages of an electrical system’s life cycle. Join & learn how you can leverage it for shortened design time, validation & transition of digital twin model to operations, early decision support, identification of operation problems & their cause, accelerated engineer & operator training, asset performance monitoring & optimization. 

Short Circuit & Dynamic Modelling of Inverter-based Resources

Short Circuit & Dynamic Modelling of Inverter-based Resources

56:38 Webinars

Today’s power systems depend on renewable energy resources to meet their load demand and are typically interconnected through inverters. This webinar demonstrates how inverter-based resources are modeled for short circuit studies. It will also review various dynamic modeling approaches offered by ETAP and discuss merits and limitations of each approach.

Smart City ADMS: Case Study of Egypt’s New Administrative Capital

Smart City ADMS: Case Study of Egypt’s New Administrative Capital

Cities of the future will soon account for 90% of the world’s population growth and 75% of its energy consumption. The pressure on critical resources will increase. The New Administrative Capital in Egypt launched one of the country’s most ambitious development projects to date, setting standards in smart city living is ADMS. ETAP ADMS will manage, control, visualize and optimize power distribution required to run critical smart services for city operators, citizens, workers, and visitors alike. Learn how ETAP ADMS is utilized to support long-term sustainable, efficient smart city services that will support a safer, more innovative, and more prosperous Egypt. 

Current Transformer Saturation & Sizing

Current Transformer Saturation & Sizing

1:02:11 Webinars

The webinar covers the fundamentals & theory of CT saturation, the effects on equipment, and how to avoid CT saturation for certain applications. It includes a demonstration on how to perform CT saturation analysis and CT sizing using ETAP.

ETAP Optimal Power Flow Analysis - Basics and Application

ETAP Optimal Power Flow Analysis - Basics and Application

49:15 Webinars

Reliable, secure and efficient operation of power systems is becoming increasingly important due to drastic changes in technology and industry structure. Learn how Optimal Power Flow enables you to improve the electrical and financial performance of electric power systems while maintaining system resiliency & security. 

Cable Ampacity & Sizing

Cable Ampacity & Sizing

27:04 Webinars

Proper sizing and current derating ensures that cables operate to their maximum potential while providing secure and reliable operation. Learn about design and application requirements to properly size and analyze cable systems based on IEEE and North American cable standards and guidelines: IEEE 399, ICEA P-54-440, NEC NFPA 70

ETAP Arc Flash Auto Evaluation

ETAP Arc Flash Auto Evaluation

Automated Arc Flash Energy Evaluation - When performing protection and coordination studies it is difficult to anticipate potential arc flash coordination issues due to the differences between the arc and bolted fault currents. Arc Flash Auto solution automatically evaluates arc-flash incident energy and equipment arc flash damage points to quickly resolve these conflicts limiting the number of scenarios required or even removing the need for an isolated arc flash study.