| |
|
| |
One-Line Diagram
|
| |
|
| |
1 |
 |
Creating a New ETAP Project in ETAP 11 (54 seconds) NEW
Learn how to create your first project in ETAP.
View YouTube | View Flash Player |
| |
2 |
 |
Open an Existing ETAP Project in ETAP 11 (2:13 seconds) NEW
Learn how to open an existing ETAP project.
View YouTube | View Flash Player |
| |
3 |
 |
Learn how to add protective devices to an existing one-line (2:20 seconds) NEW
Learn how to add protective devices like circuit breakers, switches, fuses, etc. to an existing one-line without breaking any equipment connections.
View YouTube | View Flash Player |
| |
4 |
 |
System Dumpster Basics in ETAP 11 (2:43 seconds) NEW
Learn to work with the System Dumpster and move data between the one-line and the system dumpster.
View YouTube | View Flash Player |
| |
5 |
 |
System Dumpster Application in ETAP 11 (2 minutes) NEW
Take advantage of the System Dumpster in order to move data around in your existing ETAP project.
View YouTube | View Flash Player |
| |
6 |
 |
Hyperlinks (3.5 minutes)
Have data at your fingertips by hyperlinking important information like maintenance schedules, manufacturer data sheets, etc.
View YouTube | View Flash Player |
| |
7 |
 |
Object Linking & Embedding (OLE) (3.5 minutes) NEW
Have your favorite spreadsheet or word document or simply your logo embedded on the ETAP one-line using Object Linking and Embedding (OLE) technology.
View YouTube | View Flash Player |
| |
1 |
 |
Building a One-Line Diagram (163 KB)
Quickly view one-line construction with unique tips. |
| |
2 |
 |
Using Hyperlinks in ETAP projects (233 KB)
Instructions on how to use hyperlinks in ETAP projects. |
| |
3 |
 |
Insert legends, text, and tables into one-line diagrams using OLE and ActiveX objects (198 KB)
Instructions on how to use OLE and ActiveX objects. |
| |
4 |
 |
Simplify one-line diagram connections using remote connectors (119 KB)
Instructions on how to use remote connectors in ETAP. |
| |
5 |
 |
One-Line Diagram Presentation (444 KB)
One-Line Diagram is the method of representation of modeling the electrical system in ETAP for network analyses. |
| |
6 |
 |
Choose the correct bus level
How to choose the correct bus level. |
| |
|
| |
New Project
|
| |
|
| |
1 |
 |
Creating an ETAP One-Line in ETAP 11 (3:13 seconds) NEW
Learn how to create a one-line diagram in ETAP.
View YouTube | View Flash Player |
| |
2 |
 |
Creating a New GIS Presentation (6 minutes)
Visualize the process of integrating a one-line diagram with a GIS Map in ETAP.
View YouTube | View Flash Player |
| |
1 |
 |
Send ETAP project files (458 KB)
How to send the project files to allow OTI's technical support team to see the files associated with a technical question. |
| |
|
| |
Elements
|
| |
|
| |
1 |
 |
Learn how to use and manage Composite Networks (8.21 seconds) NEW
Learn how to use and manage composite networks and organize your existing one-line diagrams for better presentation and printing.
View YouTube | View Flash Player |
| |
2 |
 |
Filter Sizing (8.25 minutes)
Learn how to size passive single-tuned filters as part of harmonic analysis.
View YouTube | View Flash Player |
| |
1 |
 |
Project View (Part 5 - Components) (124 KB)
Working with components in ETAP. |
| |
2 |
 |
Composite Network (382 KB)
The concept of “Composite Network” was integrated in ETAP to provide flexibility in simplifying and organizing the electrical one-line diagram. |
| |
3 |
 |
Series capacitor Modeling (74 KB)
Modeling a series capacitor with the help of an impedance branch in ETAP. |
| |
4 |
 |
Model a Shunt Reactor (79 KB)
How to model a shunt reactor with the help of a static load in ETAP. |
| |
5 |
 |
Model a zig-zag grounding transformer (87 KB)
How to model a zig-zag grounding transformer in ETAP. |
| |
6 |
 |
Element Properties (272 KB)
Shows how to effectively edit your elements in ETAP. |
| |
|
| |
3-D Database
|
| |
|
| |
1 |
 |
Multi-Dimensional Database (5:12 seconds) NEW
Improve efficiency, productivity and data organization by utilizing a Multi-dimensional database. This is a MUST see!
View YouTube | View Flash Player |
| |
2 |
 |
Data Revisions (7.25 minutes)
Load Growth studies? Impact of System Retrofits? Arc Flash Recommended Settings? With data revisions you can do it all in one project database.
View YouTube | View Flash Player |
| |
3 |
 |
ETAP Wizards (10.75 minutes)
Gone are the days of repetitive analysis runs. With the ETAP Wizard, complete system analysis is a click away!
View YouTube | View Flash Player |
| |
1 |
 |
Project View (Part 1 - Presentations) (567 KB)
All elements associated in an ETAP project are accounted in the Project View window. |
| |
2 |
 |
Project View (Part 2 - Configurations) (506 KB)
Working with configurations in ETAP. |
| |
3 |
 |
Project View (Part 3 - Study Cases) (251 KB)
Working with study cases in ETAP. |