These tools provide online cost and usage comparison against on-site generation, power exchange allocation, and spinning reserves while providing a power consumption and pricing profiles for reporting purposes.
- Minimize Area Control Error (ACE)
- Minimize operating costs
- Maintain generation at fixed (baseload) values
- Ramp generation in a linear fashion per interchange schedule
NERC performance calculations based on Control Performance Standard (CPS) and reports are provided, including alarming and event storage for forensic analysis. |