 |
Case
No. 1
Evaluation between the ETAP Transient Stability/Generator
Start-Up simulation results and field measurement
data for a nuclear generation plant. |
| |
|
 |
Case
No. 2
Evaluation between the ETAP Transient Stability simulation
results and I.E.E. Japan (IEEJ) Electrical Power
System Standard Benchmark for a transmission system
with a synchronous generator and the associated controls
elements. |
| |
|
 |
Case
No. 3
Evaluation between the ETAP Transient Stability simulation
results and actual fault-recorder measurements before
and after a three-phase fault in an industrial system. |
| |
|
 |
Case
No. 4
Evaluation between the ETAP Transient Stability simulation
results and a 9-Bus multi-machine power system benchmark
(Power System Control and Stability by Anderson
and Fouad) for rotor angle stability study in a multi-machine
transmission system. |
| |
|
 |
Case No. 5
Evaluation of simulation results between the ETAP Transient Stability and PTI PSS/E for a sequential motor dynamic acceleration study in an islanded industrial system. |