Case
No. 1
Evaluation between the ETAP Short-Circuit results
and hand calculations developed based on "Short-Circuit
Current Calculations for Industrial and Commercial
Power Systems” a GE Publication. |
| |
|
 |
Case
No. 2
Comparison of ETAP Short-Circuit Calculations Against a Published IEEE Example
Evaluation between the ETAP Short-Circuit results and those published in
IEEE Std. 399-1997 Section 7.7. |
| |
|
 |
Case
No. 3
Evaluation of ETAP 3-Phase Duty Short-Circuit results and those published in
44-bus example from the IEEE Std. 399-1997, Section 7.7. |