The example considered is as shown in Figure 1. It is assumed that:
1. Design loading occurs 55% of the time
2. Maximum loading (110% of design loading) occurs 25% of the time
3. Minimum loading (90% of design loading) occurs 20% of the time
4. Average energy cost is $0.07/kWh
5. Planning period is 10 years
6. 4.16 kV capacitors: 200 kvar banks
Purchase cost is $20/kvar
Installation cost is $1,200
Operating cost is $200/year
7. 13.8 kV capacitors: 300 kvar banks
Purchase cost $25/kvar
Installation cost is $1,600
Operating cost is $300/year
The objective of this exercise is to make all system bus voltages greater than 98% and less than 102%, while minimizing total cost, by adding capacitors to any bus with a nominal voltage of either 4.16kV or 13.8kV. The initial load flow study (Figure 1) shows that the voltages at buses 3, 4, 5, 6, 8, 9 and 10 are less than 98% at maximum loading conditions. The total loss of the system during maximum loading conditions is 616.3 kW. |